Local to Norwich - Visit Us

100% Waterproof Bathroom Furniture | PVC Vanity Units & Cabinets

34 products

  • Sale -50% Bathroom setup with a white vanity unit and toilet on a white background White bathroom vanity unit with sink and toilet on a white background

    Aqua Blanc 1100mm L-Shape Bathroom Furniture Set | 100% Waterproof | Gloss White Handleless | Left or Right Hand

    Create a fully coordinated bathroom in one purchase with the Aqua Blanc 1100mm L-Shape Bathroom Furniture Set. Part of Aqua Elegance's own Aqua Blanc range, this set combines a 600mm vanity unit, a 500mm WC unit, and a one-piece L-shape top with integrated basin — available in left or right hand configuration to suit your layout. Built from 100% waterproof board throughout, the Aqua Blanc range genuinely resists the humidity and splashes of daily bathroom life without warping or swelling. The handleless gloss white finish delivers a seamless, contemporary look across the entire set. Please note: Pan, cistern, seat, and tap are sold separately. Key Features Complete L-Shape Set — 600mm vanity unit, 500mm WC unit, and one-piece L-shape top with basin included Left or Right Hand Configuration — choose to suit your bathroom layout 100% Waterproof Construction — genuine waterproof board throughout; will not warp, swell, or delaminate Handleless Gloss White Doors — push-to-open, seamless contemporary aesthetic 2-Door Vanity Unit — generous under-basin storage Floorstanding — suits standard bathroom floor installations 1090mm Combined Width — efficient use of space with a fully integrated look Part of the Aqua Blanc Range — coordinates with matching individual units and bath panels What’s Included ✅ 600mm Vanity Unit ✅ 500mm WC Unit ✅ One-Piece L-Shape Top with Integrated Basin ❌ Pan — sold separately ❌ Cistern — sold separately ❌ Seat — sold separately ❌ Tap — sold separately Technical Specification Brand Aqua Elegance Range Aqua Blanc Combined Width 1090mm Height 809mm Vanity Unit Depth 445mm WC Unit Depth 245mm Configuration Left Hand or Right Hand Basin Doors 2 Colour Gloss White Finish Handleless Mounting Floorstanding Pack Includes Vanity Unit, WC Unit & Basin Top Waterproof 100% Waterproof Country of Origin United Kingdom Complete the Aqua Blanc Collection Aqua Blanc 600mm Vanity Unit & Basin — Gloss White Handleless | 100% Waterproof Aqua Blanc 500mm WC Unit — Gloss White Handleless | 100% Waterproof Aqua Blanc 400mm Cloakroom Vanity Unit — Gloss White Handleless | 100% Waterproof | 10-Year Guarantee Aqua Blanc 100% Waterproof Bath Panel — Gloss White PVC Foam | 700mm–1800mm | Lifetime Guarantee Frequently Asked Questions What does 100% waterproof mean? Unlike standard bathroom furniture made from moisture-resistant MDF, the Aqua Blanc range uses genuinely waterproof board throughout. This means the carcass will not swell, warp, or delaminate even with prolonged exposure to water and steam — making it a long-term investment for any bathroom. Which hand do I need — left or right? Stand facing the unit as it will be installed. If the basin is on the left side, choose Left Hand. If the basin is on the right side, choose Right Hand. If you’re unsure, contact us before ordering and we’ll be happy to help. Is the toilet pan and cistern included? No — the pan, cistern, seat, and tap are all sold separately. This set includes the vanity unit, WC unit carcass, and the one-piece L-shape basin top only. Does this set coordinate with other Aqua Blanc products? Yes — the Aqua Blanc range includes individual vanity units, WC units, cloakroom vanities, and waterproof bath panels, all in the same gloss white handleless finish. Can I order if the item shows as out of stock? Yes — available to order even when stock shows zero. Call us on 01603 381095 or email customerservice@bubblegumbathrooms.co.uk to confirm lead time.

    £969.00 £489.00

  • Sale -43% White bathroom vanity unit with sink and faucet on a white background Technical drawing of a rectangular object with dimensions on a white background

    Aqua Blanc 400mm Cloakroom Vanity Unit | 100% Waterproof | Gloss White Handleless | Supplied Assembled | 10 Year Guarantee

    Make the most of every inch in your cloakroom with the Aqua Blanc 400mm Cloakroom Vanity Unit. Part of Aqua Elegance's own Aqua Blanc range, this slim-profile unit is built from 100% waterproof board — not just moisture-resistant MDF — so it genuinely stands up to the humidity and splashes of daily use without warping or swelling. The single-door handleless gloss white design delivers a seamless, contemporary look, and at just 215mm deep it's perfectly proportioned for compact cloakroom spaces. Supplied fully assembled and backed by a 10-year guarantee. Key Features 100% Waterproof Construction — genuine waterproof board throughout; will not warp, swell, or delaminate Handleless Gloss White Door — push-to-open, seamless contemporary aesthetic Slim 215mm Depth — designed specifically for compact cloakroom installations Single Door — neat under-basin storage Supplied Assembled — ready to install straight from the box 390mm Wide — ideal for 400mm cloakroom basin layouts 780mm Height — comfortable working height 10-Year Guarantee — long-term peace of mind from Aqua Elegance Part of the Aqua Blanc Range — coordinates with matching vanity units, WC units, L-shape sets, and bath panels Technical Specification Brand Aqua Elegance Range Aqua Blanc Unit Width 390mm Unit Height 780mm Unit Depth 215mm Colour Gloss White Finish Handleless Style Contemporary Mounting Floorstanding Doors 1 Supplied Assembled Yes Waterproof 100% Waterproof Guarantee 10 Years Country of Origin United Kingdom Complete the Aqua Blanc Collection Aqua Blanc 600mm Vanity Unit & Basin — Gloss White Handleless | 100% Waterproof Aqua Blanc 500mm WC Unit — Gloss White Handleless | 100% Waterproof Aqua Blanc 1100mm L-Shape Furniture Set — Gloss White Handleless | 100% Waterproof Aqua Blanc 100% Waterproof Bath Panel — Gloss White PVC Foam | 700mm–1800mm | Lifetime Guarantee Frequently Asked Questions What does 100% waterproof mean? Unlike standard bathroom furniture made from moisture-resistant MDF, the Aqua Blanc range uses genuinely waterproof board throughout. This means the carcass will not swell, warp, or delaminate even with prolonged exposure to water and steam — making it a long-term investment for any cloakroom. Is a basin included? This listing is for the unit only. Please contact us at customerservice@bubblegumbathrooms.co.uk or call 01603 381095 if you need help selecting a compatible cloakroom basin. Is the unit supplied assembled? Yes — the unit arrives fully assembled, ready to install straight from the box. Does this unit coordinate with other Aqua Blanc products? Yes — the Aqua Blanc range includes 600mm vanity units, 500mm WC units, 1100mm L-shape sets, and waterproof bath panels, all in the same gloss white handleless finish. Can I order if the item shows as out of stock? Yes — available to order even when stock shows zero. Call us on 01603 381095 or email customerservice@bubblegumbathrooms.co.uk to confirm lead time.

    £281.00 £159.00

  • Sale -56% White vanity unit with sink on a white background Technical drawing of two bathroom cabinets with dimensions on a white background

    Aqua Blanc 600mm Floorstanding Vanity Unit & Basin | 100% Waterproof | Gloss White Handleless

    Bring spa-like calm to your bathroom with the Aqua Blanc 600mm Floorstanding Vanity Unit & Basin. Part of Aqua Elegance's own Aqua Blanc range, this unit is built from 100% waterproof board — not just moisture-resistant MDF — so it genuinely stands up to the steam, splashes, and humidity of daily bathroom life without warping or swelling. The clean handleless gloss white doors give a seamless, contemporary look that works equally well in a modern or transitional bathroom. Basin included. Key Features 100% Waterproof Construction — genuine waterproof board throughout; will not warp, swell, or delaminate Handleless Gloss White Doors — push-to-open, seamless contemporary aesthetic 2-Door Floorstanding Unit — generous under-basin storage Basin Included — unit and basin supplied together, ready to install 590mm Wide — ideal for standard 600mm bathroom layouts 809mm Unit Height — comfortable working height 445mm Depth — compact enough for most bathroom configurations Part of the Aqua Blanc Range — coordinates with matching WC units, cloakroom vanities, and bath panels Technical Specification Brand Aqua Elegance Range Aqua Blanc Unit Width 590mm Unit Height 809mm Unit Depth 445mm Colour Gloss White Finish Handleless Mounting Floorstanding Doors 2 Pack Includes Unit & Basin Waterproof 100% Waterproof Country of Origin United Kingdom Complete the Aqua Blanc Collection Aqua Blanc 400mm Cloakroom Vanity Unit — Gloss White Handleless | 100% Waterproof | 10-Year Guarantee Aqua Blanc 500mm WC Unit — Gloss White Handleless | 100% Waterproof Aqua Blanc 1100mm L-Shape Furniture Set — Gloss White Handleless | 100% Waterproof Aqua Blanc 100% Waterproof Bath Panel — Gloss White PVC Foam | 700mm–1800mm | Lifetime Guarantee Frequently Asked Questions What does 100% waterproof mean? Unlike standard bathroom furniture made from moisture-resistant MDF, the Aqua Blanc range uses genuinely waterproof board throughout. This means the carcass will not swell, warp, or delaminate even with prolonged exposure to water and steam — making it a long-term investment for any bathroom. Is the basin included? Yes — the basin is included with the unit. No separate basin purchase is required. Does this unit coordinate with other Aqua Blanc products? Yes — the Aqua Blanc range includes matching WC units, cloakroom vanities, L-shape furniture sets, and waterproof bath panels, all in the same gloss white handleless finish. Can I order if the item shows as out of stock? Yes — available to order even when stock shows zero. Call us on 01603 381095 or email customerservice@bubblegumbathrooms.co.uk to confirm lead time.

    £637.01 £279.00

  • Sale -36% White cabinet on a white background Technical drawing of a rectangular cabinet with dimensions labeled

    Aqua Blanc 500mm WC Unit | 100% Waterproof | Gloss White Handleless | Supplied Assembled

    Keep your WC cistern neatly concealed with the Aqua Blanc 500mm WC Unit. Part of Aqua Elegance's own Aqua Blanc range, this unit is built from 100% waterproof board — not just moisture-resistant MDF — so it genuinely stands up to the humidity and splashes of daily bathroom life without warping or swelling. The handleless gloss white door gives a seamless, contemporary look that coordinates perfectly with the rest of the Aqua Blanc furniture range. Supplied fully assembled for straightforward installation. Key Features 100% Waterproof Construction — genuine waterproof board throughout; will not warp, swell, or delaminate Handleless Gloss White Door — push-to-open, seamless contemporary aesthetic Supplied Assembled — ready to install straight from the box 500mm Wide — standard WC unit width, suits most bathroom layouts 245mm Depth — slim profile to maximise floor space 827mm Height — standard comfortable height Part of the Aqua Blanc Range — coordinates with matching vanity units, cloakroom vanities, L-shape sets, and bath panels Technical Specification Brand Aqua Elegance Range Aqua Blanc Unit Width 500mm Unit Height 827mm Unit Depth 245mm Colour Gloss White Finish Handleless Style Contemporary Supplied Assembled Yes Waterproof 100% Waterproof Country of Origin United Kingdom Complete the Aqua Blanc Collection Aqua Blanc 600mm Vanity Unit & Basin — Gloss White Handleless | 100% Waterproof Aqua Blanc 400mm Cloakroom Vanity Unit — Gloss White Handleless | 100% Waterproof | 10-Year Guarantee Aqua Blanc 1100mm L-Shape Furniture Set — Gloss White Handleless | 100% Waterproof Aqua Blanc 100% Waterproof Bath Panel — Gloss White PVC Foam | 700mm–1800mm | Lifetime Guarantee Frequently Asked Questions What does 100% waterproof mean? Unlike standard bathroom furniture made from moisture-resistant MDF, the Aqua Blanc range uses genuinely waterproof board throughout. This means the carcass will not swell, warp, or delaminate even with prolonged exposure to water and steam — making it a long-term investment for any bathroom. Is the unit supplied assembled? Yes — the unit arrives fully assembled, ready to install straight from the box. Is the cistern or toilet pan included? No — this is the furniture unit only. The cistern and toilet pan are sold separately. Please contact us if you need help selecting a compatible pan and cistern. Does this unit coordinate with other Aqua Blanc products? Yes — the Aqua Blanc range includes matching vanity units, cloakroom vanities, L-shape furniture sets, and waterproof bath panels, all in the same gloss white handleless finish. Can I order if the item shows as out of stock? Yes — available to order even when stock shows zero. Call us on 01603 381095 or email customerservice@bubblegumbathrooms.co.uk to confirm lead time.

    £250.00 £159.00

  • Sale -32% FlowLine Combination B | Fitted Bathroom Furniture Set | 3 Colours FlowLine Combination B | Fitted Bathroom Furniture Set | 3 Colours

    FlowLine Combination B | Fitted Bathroom Furniture Set | 3 Colours

    FlowLine Combination B is the wider-format version of our complete fitted bathroom set. Four coordinating units — a tall storage unit, a 300mm base unit, a 600mm base unit (ideal as a larger sink base), and a 500mm WC unit — all supplied in your chosen finish, all constructed from 100% waterproof PVC that will never warp, swell, or deteriorate. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak. 💰 Save £580 compared to buying units individually. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. What’s Included in Combination B FlowLine 300mm Tall Unit — 1900×300×330mm, floor-standing, maximises vertical storage FlowLine 300mm Base Unit — 780×300×330mm, single door, compact storage FlowLine 600mm Base Unit — 780×600×330mm, 2 doors, storage cupboard or sink base FlowLine 500mm WC Unit — 780×500×330mm, designed for concealed cistern system Total combined width (all units): 1700mm How Does Combination B Differ from Combination A? Combination B replaces the 500mm base unit with a wider 600mm base unit, giving you more counter space and storage when used as a sink base. Total combined width increases from 1600mm to 1700mm. All other units are identical. Key Features 100% waterproof PVC construction throughout — won’t warp, swell, or deteriorate in high-moisture environments Four coordinating units — complete fitted bathroom look in one purchase 600mm base unit — wider sink base option vs Combination A All units supplied in your chosen finish — perfectly matched 3 contemporary finishes — Creamy White, Light Grey, Oak Floor-standing design — true fitted bathroom aesthetic Save £580 vs buying units individually Superior durability vs MDF or timber — immune to moisture damage Why Choose 100% Waterproof PVC? Traditional fitted bathroom furniture made from MDF or timber is highly susceptible to moisture damage — swelling, warping, and deteriorating over time. The FlowLine range is constructed entirely from waterproof PVC, making it completely immune to water damage and the ideal long-term investment for: Family bathrooms with heavy daily use En-suites with showers or steam Bathrooms prone to condensation Anyone wanting fitted furniture that genuinely lasts Technical Specification Brand: Aqua Elegance Range: FlowLine Set: Combination B (4 units) Core material: 100% waterproof PVC Country of Origin: China HS Code: 9403.89 Finish options: Creamy White / Light Grey / Oak SKU (Creamy White): FF-COMBI-B-CW SKU (Light Grey): FF-COMBI-B-LG SKU (Oak): FF-COMBI-B-OAK Unit Dimensions Tall Unit: 1900mm (H) × 300mm (W) × 330mm (D) 300mm Base Unit: 780mm (H) × 300mm (W) × 330mm (D) 600mm Base Unit: 780mm (H) × 600mm (W) × 330mm (D) 500mm WC Unit: 780mm (H) × 500mm (W) × 330mm (D) Total combined width: 1700mm Not Included — Sold Separately To complete your bathroom installation you will also need: Basin and worktop — see FlowLine Add-Ons & Accessories Concealed cistern frame — see Concealed Cisterns Back-to-wall WC pan — see Back to Wall Pans Flush plate — see Flush Plates for Frames Basin tap and waste — see Basin Taps Explore the FlowLine Range FlowLine Fitted Bathroom Furniture — view all individual FlowLine units FlowLine Add-Ons & Accessories — worktops, handles, and accessories FlowLine Combination A — similar set with 500mm base unit FlowLine 300mm Tall Storage Unit — buy individually FlowLine 300mm Base Unit — buy individually FlowLine 600mm Base Unit — buy individually FlowLine 500mm WC Unit — buy individually 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions What units are included in Combination B? Combination B includes four units: the FlowLine 300mm Tall Unit, FlowLine 300mm Base Unit, FlowLine 600mm Base Unit, and FlowLine 500mm WC Unit — all in your chosen finish. What’s the difference between Combination A and Combination B? Combination B replaces the 500mm base unit (in Combination A) with a wider 600mm base unit, giving more counter space and storage. Total combined width is 1700mm vs 1600mm for Combination A. How much do I save vs buying individually? Combination B saves you £580 compared to purchasing the four units separately. Is the cistern, basin, or worktop included? No — the basin, worktop, concealed cistern, WC pan, flush plate, and taps are all sold separately. See the links above for compatible options. What finishes are available? Available in three finishes: Creamy White, Light Grey, and Oak. All four units will be supplied in your chosen finish. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    £1,785.00 £1,205.00

  • Sale -32% FlowLine Combination A | Fitted Bathroom Furniture Set | 3 Colours FlowLine Combination A | Fitted Bathroom Furniture Set | 3 Colours

    FlowLine Combination A | Fitted Bathroom Furniture Set | 3 Colours

    FlowLine Combination A is the fastest way to a complete, fully fitted waterproof bathroom. Four coordinating units — a tall storage unit, two base units, and a WC unit — all supplied in your chosen finish, all constructed from 100% waterproof PVC that will never warp, swell, or deteriorate. Choose your colour, and everything arrives matched and ready to install. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak. 💰 Save £536 compared to buying units individually. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. What’s Included in Combination A FlowLine 300mm Tall Unit — 1900×300×330mm, floor-standing, maximises vertical storage FlowLine 300mm Base Unit — 780×300×330mm, single door, compact storage FlowLine 500mm Base Unit — 780×500×330mm, 2 doors, storage cupboard or sink base FlowLine 500mm WC Unit — 780×500×330mm, designed for concealed cistern system Total combined width (all units): 1600mm Key Features 100% waterproof PVC construction throughout — won’t warp, swell, or deteriorate in high-moisture environments Four coordinating units — complete fitted bathroom look in one purchase All units supplied in your chosen finish — perfectly matched 3 contemporary finishes — Creamy White, Light Grey, Oak Floor-standing design — true fitted bathroom aesthetic Save £536 vs buying units individually Superior durability vs MDF or timber — immune to moisture damage Why Choose 100% Waterproof PVC? Traditional fitted bathroom furniture made from MDF or timber is highly susceptible to moisture damage — swelling, warping, and deteriorating over time. The FlowLine range is constructed entirely from waterproof PVC, making it completely immune to water damage and the ideal long-term investment for: Family bathrooms with heavy daily use En-suites with showers or steam Bathrooms prone to condensation Anyone wanting fitted furniture that genuinely lasts Technical Specification Brand: Aqua Elegance Range: FlowLine Set: Combination A (4 units) Core material: 100% waterproof PVC Country of Origin: China HS Code: 9403.89 Finish options: Creamy White / Light Grey / Oak SKU (Creamy White): FF-COMBI-A-CW SKU (Light Grey): FF-COMBI-A-LG SKU (Oak): FF-COMBI-A-OAK Unit Dimensions Tall Unit: 1900mm (H) × 300mm (W) × 330mm (D) 300mm Base Unit: 780mm (H) × 300mm (W) × 330mm (D) 500mm Base Unit: 780mm (H) × 500mm (W) × 330mm (D) 500mm WC Unit: 780mm (H) × 500mm (W) × 330mm (D) Total combined width: 1600mm Not Included — Sold Separately To complete your bathroom installation you will also need: Basin and worktop — see FlowLine Add-Ons & Accessories Concealed cistern frame — see Concealed Cisterns Back-to-wall WC pan — see Back to Wall Pans Flush plate — see Flush Plates for Frames Basin tap and waste — see Basin Taps Explore the FlowLine Range FlowLine Fitted Bathroom Furniture — view all individual FlowLine units FlowLine Add-Ons & Accessories — worktops, handles, and accessories FlowLine 300mm Tall Storage Unit — buy individually FlowLine 300mm Base Unit — buy individually FlowLine 500mm Base Unit — buy individually FlowLine 500mm WC Unit — buy individually 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions What units are included in Combination A? Combination A includes four units: the FlowLine 300mm Tall Unit, FlowLine 300mm Base Unit, FlowLine 500mm Base Unit, and FlowLine 500mm WC Unit — all in your chosen finish. How much do I save vs buying individually? Combination A saves you £536 compared to purchasing the four units separately. Is the cistern, basin, or worktop included? No — the basin, worktop, concealed cistern, WC pan, flush plate, and taps are all sold separately. See the links above for compatible options. What finishes are available? Available in three finishes: Creamy White, Light Grey, and Oak. All four units will be supplied in your chosen finish. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    £1,675.00 £1,139.00

  • Sale -32% FlowLine 500mm Waterproof WC Unit | Fitted Bathroom Furniture | 3 Colours FlowLine 500mm Waterproof WC Unit | Fitted Bathroom Furniture | 3 Colours

    FlowLine 500mm Waterproof WC Unit | Fitted Bathroom Furniture | 3 Colours

    The FlowLine 500mm WC Unit is the waterproof answer to the age-old problem of toilet leaks destroying bathroom furniture. Constructed from 100% waterproof PVC, it will never warp, swell, or deteriorate — even if the cistern drips for years. Designed to house a concealed cistern system, it creates a clean, streamlined look that coordinates seamlessly with the rest of the FlowLine fitted furniture range. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof PVC construction — won’t warp, swell, or deteriorate in high-moisture environments Concealed cistern design — clean, streamlined aesthetics; cistern sold separately 500mm width — standard fit for most bathroom layouts Floor-standing design — creates a true fitted furniture look 3 contemporary finishes — Creamy White, Light Grey, Oak Coordinates with the full FlowLine range — pair with base units, tall units, and vanity units Superior durability vs MDF or timber — immune to moisture and leak damage Why Choose 100% Waterproof PVC? WC units are particularly vulnerable to water damage from slow cistern leaks, condensation, and cleaning. Traditional MDF or timber WC furniture can swell, warp, and deteriorate over time. The FlowLine range’s waterproof PVC construction eliminates this risk entirely, making it ideal for: Family bathrooms with heavy daily use Preventing costly water damage from toilet leaks Bathrooms prone to condensation Anyone wanting fitted furniture that genuinely lasts Low-maintenance, easy-clean bathroom furniture Technical Specification Brand: Aqua Elegance Range: FlowLine Type: WC unit — floor-standing, concealed cistern Width: 500mm Height: 780mm Depth: 330mm Core material: 100% waterproof PVC Country of Origin: China HS Code: 9403.89 Finish options: Creamy White / Light Grey / Oak SKU (Creamy White): FFWC500-KB-CW SKU (Light Grey): FFWC500-KB-LG SKU (Oak): FFWC500-KB-OAK What’s Included FlowLine waterproof WC unit Not included — sold separately: concealed cistern, back-to-wall WC pan, flush plate. Complete the FlowLine Range The FlowLine WC Unit is designed to coordinate seamlessly with other units in the FlowLine range: FlowLine Fitted Bathroom Furniture — view all FlowLine units FlowLine Add-Ons & Accessories — worktops, handles, and accessories FlowLine 600mm Base Unit — matching base unit FlowLine 500mm Base Unit — matching 500mm base unit FlowLine 300mm Tall Storage Unit — matching tall unit Flush Plates for Frames — compatible flush plates Concealed Cisterns — compatible concealed cistern frames Back to Wall Pans — compatible WC pans 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the FlowLine range is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or timber furniture that can swell and deteriorate when exposed to water or leaks, the PVC construction will not warp, swell, or degrade. What are the dimensions? The unit is 500mm wide, 330mm deep, and 780mm tall. Is the cistern included? No — the concealed cistern, WC pan, and flush plate are all sold separately. This listing is for the WC unit carcass only. Browse our concealed cisterns, back-to-wall pans, and flush plates for compatible options. What finishes are available? Available in three finishes: Creamy White, Light Grey, and Oak. Select your preferred finish from the variant selector above. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    £385.00 £260.00

  • Sale -32% FlowLine 600mm Waterproof Base Unit | 2 Door | Storage or Sink Base | 3 Colours FlowLine 600mm Waterproof Base Unit | 2 Door | Storage or Sink Base | 3 Colours

    FlowLine 600mm Waterproof Base Unit | 2 Door | Storage or Sink Base | 3 Colours

    The FlowLine 600mm Base Unit is the standard-width workhorse of the FlowLine fitted furniture range. At 600mm wide and 780mm tall, the twin-door design provides generous concealed storage — and it’s equally at home as a sink base when paired with a compatible worktop and basin. The 100% waterproof PVC construction means it will never warp, swell, or deteriorate, no matter how wet your bathroom gets. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof PVC construction — won’t warp, swell, or deteriorate in high-moisture environments 2 doors — generous concealed storage for bathroom essentials Versatile use — works as a storage cupboard or sink base (worktop and basin sold separately) 600mm width — standard width, ideal for most bathroom layouts Floor-standing design — creates a true fitted furniture look 3 contemporary finishes — Creamy White, Light Grey, Oak Coordinates with the full FlowLine range — mix and match units for a bespoke fitted bathroom Superior durability vs MDF or timber — immune to moisture damage Why Choose 100% Waterproof PVC? Traditional fitted bathroom furniture made from MDF or timber is highly susceptible to moisture damage — swelling, warping, and deteriorating over time in the humid bathroom environment. The FlowLine range is constructed entirely from waterproof PVC, making it completely immune to water damage and the ideal long-term investment for: Family bathrooms with heavy daily use En-suites with showers or steam Bathrooms prone to condensation Anyone wanting fitted furniture that genuinely lasts Low-maintenance, easy-clean bathroom storage Technical Specification Brand: Aqua Elegance Range: FlowLine Type: Base unit — 2 doors, floor-standing (storage or sink base) Width: 600mm Height: 780mm Depth: 330mm Core material: 100% waterproof PVC Country of Origin: China HS Code: 9403.89 Finish options: Creamy White / Light Grey / Oak SKU (Creamy White): FF600-KB-CW SKU (Light Grey): FF600-KB-LG SKU (Oak): FF600-KB-OAK What’s Included FlowLine waterproof 600mm base unit Not included — sold separately: basin, worktop, other FlowLine units. Complete the FlowLine Range The FlowLine 600mm Base Unit is designed to coordinate seamlessly with other units in the FlowLine range: FlowLine Fitted Bathroom Furniture — view all FlowLine units FlowLine Add-Ons & Accessories — worktops, handles, and accessories FlowLine 300mm Tall Storage Unit — matching tall unit FlowLine 300mm Base Unit — compact 300mm version FlowLine 500mm Base Unit — mid-size 500mm version 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the FlowLine range is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or timber furniture that can swell and deteriorate when exposed to water, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms. Can I use this as a sink base? Yes — the 600mm base unit can be used as a sink base when paired with a compatible worktop and basin, both available separately. Browse the FlowLine Add-Ons for compatible worktops. What are the dimensions? The unit is 600mm wide, 330mm deep, and 780mm tall. Is a basin or worktop included? No — this listing is for the base unit only. Basins, worktops, and other FlowLine units are available separately. Browse the FlowLine range and FlowLine Add-Ons for compatible options. What finishes are available? Available in three finishes: Creamy White, Light Grey, and Oak. Select your preferred finish from the variant selector above. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    £555.00 £379.00

  • Sale -31% FlowLine 500mm Waterproof Base Unit | 2 Door | Storage or Sink Base | 3 Colours FlowLine 500mm Waterproof Base Unit | 2 Door | Storage or Sink Base | 3 Colours

    FlowLine 500mm Waterproof Base Unit | 2 Door | Storage or Sink Base | 3 Colours

    The FlowLine 500mm Base Unit is the workhorse of the FlowLine fitted furniture range. At 500mm wide and 780mm tall, the twin-door design provides generous concealed storage — and it’s equally at home as a sink base when paired with a compatible worktop and basin. The 100% waterproof PVC construction means it will never warp, swell, or deteriorate, no matter how wet your bathroom gets. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof PVC construction — won’t warp, swell, or deteriorate in high-moisture environments 2 doors — generous concealed storage for bathroom essentials Versatile use — works as a storage cupboard or sink base (worktop and basin sold separately) 500mm width — ideal for standard bathroom layouts Floor-standing design — creates a true fitted furniture look 3 contemporary finishes — Creamy White, Light Grey, Oak Coordinates with the full FlowLine range — mix and match units for a bespoke fitted bathroom Superior durability vs MDF or timber — immune to moisture damage Why Choose 100% Waterproof PVC? Traditional fitted bathroom furniture made from MDF or timber is highly susceptible to moisture damage — swelling, warping, and deteriorating over time in the humid bathroom environment. The FlowLine range is constructed entirely from waterproof PVC, making it completely immune to water damage and the ideal long-term investment for: Family bathrooms with heavy daily use En-suites with showers or steam Bathrooms prone to condensation Anyone wanting fitted furniture that genuinely lasts Low-maintenance, easy-clean bathroom storage Technical Specification Brand: Aqua Elegance Range: FlowLine Type: Base unit — 2 doors, floor-standing (storage or sink base) Width: 500mm Height: 780mm Depth: 330mm Core material: 100% waterproof PVC Country of Origin: China HS Code: 9403.89 Finish options: Creamy White / Light Grey / Oak SKU (Creamy White): FF500-KB-CW SKU (Light Grey): FF500-KB-LG SKU (Oak): FF500-KB-OAK What’s Included FlowLine waterproof 500mm base unit Not included — sold separately: basin, worktop, other FlowLine units. Complete the FlowLine Range The FlowLine 500mm Base Unit is designed to coordinate seamlessly with other units in the FlowLine range: FlowLine Fitted Bathroom Furniture — view all FlowLine units FlowLine Add-Ons & Accessories — worktops, handles, and accessories FlowLine 300mm Tall Storage Unit — matching tall unit FlowLine 300mm Base Unit — compact 300mm version 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the FlowLine range is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or timber furniture that can swell and deteriorate when exposed to water, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms. Can I use this as a sink base? Yes — the 500mm base unit can be used as a sink base when paired with a compatible worktop and basin, both available separately. Browse the FlowLine Add-Ons for compatible worktops. What are the dimensions? The unit is 500mm wide, 330mm deep, and 780mm tall. Is a basin or worktop included? No — this listing is for the base unit only. Basins, worktops, and other FlowLine units are available separately. Browse the FlowLine range and FlowLine Add-Ons for compatible options. What finishes are available? Available in three finishes: Creamy White, Light Grey, and Oak. Select your preferred finish from the variant selector above. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    £445.00 £309.00

  • Sale -30% FlowLine 300mm Waterproof Base Unit | Single Door | Fitted Bathroom Furniture | 3 Colours FlowLine 300mm Waterproof Base Unit | Single Door | Fitted Bathroom Furniture | 3 Colours

    FlowLine 300mm Waterproof Base Unit | Single Door | Fitted Bathroom Furniture | 3 Colours

    The FlowLine 300mm Base Unit is the building block of a fully fitted waterproof bathroom. At 300mm wide and 780mm tall, it’s compact enough to slot into any layout — as a standalone unit, or as part of a larger run alongside the FlowLine Tall Unit, vanity units, and WC units. The single-door design provides neat, concealed storage, and the 100% waterproof PVC construction means it will never warp, swell, or deteriorate. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof PVC construction — won’t warp, swell, or deteriorate in high-moisture environments Single door — neat, concealed storage for bathroom essentials 300mm width — compact footprint; ideal standalone or as part of a fitted run Floor-standing design — creates a true fitted furniture look 3 contemporary finishes — Creamy White, Light Grey, Oak Coordinates with the full FlowLine range — mix and match units for a bespoke fitted bathroom Superior durability vs MDF or timber — immune to moisture damage Easy to clean — waterproof PVC surface resists staining and moisture Why Choose 100% Waterproof PVC? Traditional fitted bathroom furniture made from MDF or timber is highly susceptible to moisture damage — swelling, warping, and deteriorating over time in the humid bathroom environment. The FlowLine range is constructed entirely from waterproof PVC, making it completely immune to water damage and the ideal long-term investment for: Family bathrooms with heavy daily use En-suites with showers or steam Bathrooms prone to condensation Anyone wanting fitted furniture that genuinely lasts Low-maintenance, easy-clean bathroom storage Technical Specification Brand: Aqua Elegance Range: FlowLine Type: Base unit — single door, floor-standing Width: 300mm Height: 780mm Depth: 330mm Core material: 100% waterproof PVC Country of Origin: China HS Code: 9403.89 Finish options: Creamy White / Light Grey / Oak SKU (Creamy White): FF300-KB-1 ⚠️ Generic — consider updating to finish-specific SKU SKU (Light Grey): FF300-KB-2 ⚠️ Generic — consider updating to finish-specific SKU SKU (Oak): FF300-KB-3 ⚠️ Generic — consider updating to finish-specific SKU What’s Included FlowLine waterproof base unit Not included — sold separately: basin, worktop, other FlowLine units. Complete the FlowLine Range The FlowLine Base Unit is designed to coordinate seamlessly with other units in the FlowLine range: FlowLine Fitted Bathroom Furniture — view all FlowLine units FlowLine Add-Ons & Accessories — worktops, handles, and accessories FlowLine 300mm Tall Storage Unit — matching tall unit 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the FlowLine range is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or timber furniture that can swell and deteriorate when exposed to water, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms. What are the dimensions? The unit is 300mm wide, 330mm deep, and 780mm tall. Is a basin or worktop included? No — this listing is for the base unit only. Basins, worktops, and other FlowLine units are available separately. Browse the FlowLine range and FlowLine Add-Ons for compatible options. What finishes are available? Available in three finishes: Creamy White, Light Grey, and Oak. Select your preferred finish from the variant selector above. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    £300.00 £209.00

  • Sale -32% FlowLine 300mm Waterproof Tall Storage Unit | Fitted Bathroom Furniture | 3 Colours FlowLine 300mm Waterproof Tall Storage Unit | Fitted Bathroom Furniture | 3 Colours

    FlowLine 300mm Waterproof Tall Storage Unit | Fitted Bathroom Furniture | 3 Colours

    The FlowLine Tall Unit is the anchor piece of the FlowLine fitted furniture range — a floor-to-ceiling storage solution that brings a bespoke, built-in look to any bathroom without the vulnerability of traditional timber furniture. At 1900mm tall and just 300mm wide, it delivers impressive storage in a slim footprint, and the 100% waterproof PVC construction means it will never warp, swell, or deteriorate. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof PVC construction — won’t warp, swell, or deteriorate in high-moisture environments 1900mm height — floor-to-ceiling storage in a slim 300mm footprint Floor-standing design — creates a true fitted furniture look 3 contemporary finishes — Creamy White, Light Grey, Oak Coordinates with the full FlowLine range — mix and match units for a bespoke fitted bathroom Superior durability vs MDF or timber — immune to moisture damage Easy to clean — waterproof PVC surface resists staining and moisture Why Choose 100% Waterproof PVC? Traditional fitted bathroom furniture made from MDF or timber is highly susceptible to moisture damage — swelling, warping, and deteriorating over time in the humid bathroom environment. The FlowLine range is constructed entirely from waterproof PVC, making it completely immune to water damage and the ideal long-term investment for: Family bathrooms with heavy daily use En-suites with showers or steam Bathrooms prone to condensation Anyone wanting fitted furniture that genuinely lasts Low-maintenance, easy-clean bathroom storage Technical Specification Brand: Aqua Elegance Range: FlowLine Type: Tall storage unit — floor-standing Width: 300mm Height: 1900mm Depth: 330mm Core material: 100% waterproof PVC Country of Origin: China HS Code: 9403.89 Finish options: Creamy White / Light Grey / Oak SKU (Creamy White): FF300-KBL-CW SKU (Light Grey): FF300-KBL-LG SKU (Oak): FF300-KBL-OAK What’s Included FlowLine waterproof tall storage unit Not included — sold separately: basin, worktop, other FlowLine units. Complete the FlowLine Range The FlowLine Tall Unit is designed to coordinate seamlessly with other units in the FlowLine range, allowing you to create a fully fitted, bespoke bathroom look: FlowLine Fitted Bathroom Furniture — view all FlowLine units FlowLine Add-Ons & Accessories — worktops, handles, and accessories 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the FlowLine range is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or timber furniture that can swell and deteriorate when exposed to water, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms. What are the dimensions? The unit is 300mm wide, 330mm deep, and 1900mm tall. Is a basin or worktop included? No — this listing is for the tall storage unit only. Basins, worktops, and other FlowLine units are available separately. Browse the FlowLine range and FlowLine Add-Ons for compatible options. What finishes are available? Available in three finishes: Creamy White, Light Grey, and Oak. Select your preferred finish from the variant selector above. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    £545.00 £369.00

  • Sale -33% AquaCore 300mm Waterproof Wall Mounted Storage Unit | 2 Door & Open Shelf | Oak Detail AquaCore 300mm Waterproof Wall Mounted Storage Unit | 2 Door & Open Shelf | Oak Detail

    AquaCore 300mm Waterproof Wall Mounted Storage Unit | 2 Door & Open Shelf | Oak Detail

    The AquaCore 300mm Wall Mounted Storage Unit is the perfect companion to the AquaCore vanity unit — and a genuinely useful piece of bathroom storage in its own right. At 1200mm tall and just 300mm wide, it maximises vertical storage without taking up valuable floor space. Two doors provide concealed storage, while the open oak shelf adds a warm, organic contrast to the bold Dark Blue or clean Matt White finish. Constructed from 100% waterproof PVC, it will never warp, swell, or deteriorate — no matter how steamy your bathroom gets. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof PVC construction — won’t warp, swell, or deteriorate in high-moisture environments Wall-mounted design — keeps floor space clear; ideal for compact bathrooms 2 doors — concealed storage for toiletries and bathroom essentials Open oak shelf — warm, contemporary contrast; ideal for towels, baskets, or display 1200mm height — maximises vertical storage in a slim 300mm footprint 2 contemporary colourways — Dark Blue with Oak Shelf / Matt White with Oak Shelf Designed to complement the AquaCore vanity unit — coordinated designer bathroom look KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture Why Choose Waterproof PVC Construction? Bathroom storage units are constantly exposed to steam, condensation, and splashes. Traditional MDF and wood-based units swell, warp, and deteriorate over time. The AquaCore’s waterproof PVC construction eliminates this risk entirely, making it ideal for: High-moisture family bathrooms En-suites with walk-in showers Bathrooms prone to condensation Busy households requiring low-maintenance furniture Anyone wanting storage that genuinely lasts Technical Specification Brand: Aqua Elegance Range: AquaCore Manufacturer: KDK (Canadian brand, manufactured in China) Type: Wall-mounted storage unit Width: 300mm Height: 1200mm Depth: 290mm Doors: 2 Shelf: Open oak shelf Core material: 100% waterproof PVC Country of Origin: China HS Code: 9403.89 Colourways: Dark Blue with Oak Shelf / Matt White with Oak Shelf SKU (Dark Blue with Oak Shelf): PG300-WH-DARK-BLUE SKU (Matt White with Oak Shelf): PG300-WH-MW What’s Included AquaCore waterproof wall-mounted storage unit Wall fixing hardware Perfect Pairing This storage unit is designed to complement the AquaCore 590mm Waterproof Vanity Unit with Basin for a coordinated, designer bathroom look. 100% Waterproof Furniture — browse our full waterproof range Mirrors — coordinate with a wall mirror or LED mirror cabinet Frequently Asked Questions Is this unit genuinely waterproof? Yes — the AquaCore storage unit is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or chipboard that can swell and deteriorate when exposed to water, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms. What storage does it have? The unit has 2 doors providing concealed storage, plus an open oak shelf — ideal for towels, baskets, or display items. What are the dimensions? The unit is 300mm wide, 290mm deep, and 1200mm tall. Does it pair with the AquaCore vanity unit? Yes — it’s designed to coordinate with the AquaCore 590mm Vanity Unit. Both are available in matching Dark Blue with Oak Shelf and Matt White with Oak Shelf colourways. What colourways are available? Available in two colourways: Dark Blue with Oak Shelf and Matt White with Oak Shelf. Select your preferred option from the variant selector above. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    £400.00 £270.00

  • Sale -32% AquaCore 590mm Waterproof Vanity Unit with Basin | 2 Drawer & Open Shelf | Oak Detail AquaCore 590mm Waterproof Vanity Unit with Basin | 2 Drawer & Open Shelf | Oak Detail

    AquaCore 590mm Waterproof Vanity Unit with Basin | 2 Drawer & Open Shelf | Oak Detail

    The AquaCore is a bold departure from standard waterproof furniture. Where most units offer doors or drawers, the AquaCore gives you both — two soft-close drawers for everyday essentials, plus an open lower shelf with a natural oak detail that adds warmth and visual interest. The 100% waterproof PVC core means it will never warp, swell, or deteriorate, and the premium finish is easy to clean and built to last. At 590mm wide with an integrated basin included, it’s a complete, design-led solution available in two striking colourways: Dark Blue with Oak Shelf and Matt White with Oak Shelf. ⚠️ Tap and waste not included — sold separately. The basin has 1 tap hole, compatible with a standard monobloc basin mixer or pillar tap. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof PVC core — won’t warp, swell, or deteriorate in high-moisture environments 2 soft-close drawers — organised storage for everyday bathroom essentials Open lower shelf with oak detail — warm, contemporary contrast; ideal for towels or display 590mm width — ideal for standard bathrooms and en-suites Integrated basin included — 1 tap hole; ready to install 2 contemporary colourways — Dark Blue with Oak Shelf / Matt White with Oak Shelf Floor-standing freestanding installation — no specialist wall fixings required KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture Why Choose Waterproof PVC Construction? Traditional MDF or wood-based bathroom furniture is vulnerable to the inevitable moisture of a bathroom environment — swelling, warping, and deteriorating over time. The AquaCore’s waterproof PVC core eliminates this risk entirely, making it the ideal long-term investment for: High-moisture family bathrooms En-suites with walk-in showers Bathrooms prone to condensation Busy households requiring low-maintenance furniture Anyone wanting furniture that genuinely lasts Technical Specification Brand: Aqua Elegance Range: AquaCore Manufacturer: KDK (Canadian brand, manufactured in China) Configuration: Floor-standing vanity unit — 2 soft-close drawers + open lower shelf Width: 590mm Height: 840mm Depth: 455mm Basin: Integrated — 1 tap hole (included) Shelf detail: Oak Core material: 100% waterproof PVC Country of Origin: China HS Code: 9403.89 Colourways: Dark Blue with Oak Shelf / Matt White with Oak Shelf SKU (Dark Blue with Oak Shelf): ⚠️ Not assigned — please add SKU (Matt White with Oak Shelf): ⚠️ Not assigned — please add What’s Included AquaCore waterproof vanity unit Integrated basin with 1 tap hole Not included — sold separately: tap, basin waste. Explore More Waterproof Furniture 100% Waterproof Furniture — browse our full waterproof range Basin Taps — select a compatible monobloc mixer or pillar tap Mirrors — coordinate with a wall mirror or LED mirror cabinet Frequently Asked Questions Is this unit genuinely waterproof? Yes — the AquaCore is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or chipboard furniture that can swell and deteriorate when exposed to water, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms. What storage does it have? The AquaCore has 2 soft-close drawers for organised storage, plus an open lower shelf with an oak detail — ideal for towels, baskets, or display items. What are the dimensions? The unit is 590mm wide, 455mm deep, and 840mm tall. Is the basin included? Yes — the integrated basin with 1 tap hole is included. A tap and basin waste are not included and must be purchased separately. What tap do I need? The basin has a single tap hole, compatible with any standard monobloc basin mixer tap. Browse our basin taps range to find a compatible option. What colourways are available? Available in two colourways: Dark Blue with Oak Shelf and Matt White with Oak Shelf. Select your preferred option from the variant selector above. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    £745.00 £509.00

  • Sale -32% Melbourne 800mm Waterproof Vanity Unit with Slim Basin | 4 Colours Melbourne 800mm Waterproof Vanity Unit with Slim Basin | 4 Colours

    Melbourne 800mm Waterproof Vanity Unit with Slim Basin | 4 Colours

    The Melbourne 800mm vanity unit features the Slim basin style — sitting in the sweet spot between compact and spacious. Wide enough for generous counter space and two-door storage, compact enough to suit most family bathrooms and master en-suites. The 100% waterproof expanded PVC core means it will never warp, swell, or deteriorate, and the luxury polyurethane (PU) surface finish gives it a premium, tactile quality that’s easy to clean and built to last. Integrated Slim basin included — available in four contemporary finishes: White Gloss, Light Grey, Mid Grey, and Matt Black. ⚠️ Tap not included — sold separately. The basin has 1 tap hole, compatible with a standard monobloc basin mixer or pillar tap. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof expanded PVC core — won’t warp, swell, or deteriorate in high-moisture environments Luxury polyurethane (PU) surface finish — premium tactile quality, easy to clean, moisture-resistant Slim basin style — sleek, low-profile integrated basin design 2-door configuration — generous concealed storage for toiletries and bathroom essentials 800mm width — generous counter space for family bathrooms and master en-suites Integrated basin included — 1 tap hole; ready to install 4 contemporary finishes — White Gloss, Light Grey, Mid Grey, Matt Black Freestanding installation — no specialist wall fixings required KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture Why Choose Waterproof PVC Construction? Unlike traditional MDF or wood-based bathroom furniture, the Melbourne range is built on an expanded PVC core, making it completely waterproof. This material won’t warp, swell, or deteriorate when exposed to moisture — making it the ideal choice for: High-moisture bathrooms and wet rooms Family bathrooms with heavy daily use En-suites with walk-in showers Bathrooms prone to condensation Anywhere long-term durability in a wet environment is a priority Technical Specification Full dimensions including height and depth are shown in the product images above. Brand: Aqua Elegance Range: Melbourne Basin Style: Slim Manufacturer: KDK (Canadian brand, manufactured in China) Configuration: Freestanding vanity unit — 2 doors (no drawers) Width: 800mm Basin: Integrated Slim basin — 1 tap hole (included) Core material: Expanded PVC (100% waterproof) Surface finish: Luxury polyurethane (PU) Country of Origin: China HS Code: 9403.89 Finish options: White Gloss / Light Grey / Mid Grey / Matt Black SKU (White Gloss): PF800-KB-WG-SLIM SKU (Light Grey): PF800-KB-LG-SLIM SKU (Mid Grey): PF800-KB-MG-SLIM SKU (Matt Black): PF800-KB-MB-SLIM What’s Included Waterproof vanity unit with 2 doors Integrated Slim basin with 1 tap hole Complete the Melbourne Collection Pair this vanity unit with matching Melbourne furniture for a fully coordinated bathroom: Melbourne Range — view all products in the collection Melbourne & Sydney 500mm Waterproof WC Unit with Top — matching WC unit Melbourne 500mm Waterproof Vanity Unit with Edge Basin — compact 500mm version Melbourne 600mm Waterproof Vanity Unit with Edge Basin — 600mm version Melbourne 750mm Waterproof Vanity Unit with Edge Basin — 750mm version Melbourne 900mm Waterproof Vanity Unit with Slim Basin — 900mm version Melbourne 1200mm Waterproof Vanity Unit with Slim Basin — 1200mm version Basin Taps — select a compatible monobloc mixer or pillar tap Mirrors — coordinate with a wall mirror or LED mirror cabinet 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the Melbourne range is built on an expanded PVC core, which is inherently waterproof. Unlike MDF or chipboard furniture that can swell and deteriorate when exposed to moisture, the PVC core will not warp, swell, or degrade even in high-humidity bathrooms or wet rooms. Does this unit have drawers? No — the 800mm unit has a 2-door configuration with no drawers. Storage is accessed via the two hinged doors. What is the polyurethane (PU) finish? The luxury PU finish is a high-quality surface coating applied over the waterproof PVC core. It provides a premium, tactile feel, is easy to clean, and offers excellent resistance to moisture and everyday wear. What are the dimensions? The unit is 800mm wide. Full dimensions including height and depth are shown in the product images above. Is the basin included? Yes — the integrated Slim basin with 1 tap hole is included. A tap is not included and must be purchased separately. What tap do I need? The basin has a single tap hole, compatible with any standard monobloc basin mixer tap. Browse our basin taps range to find a compatible option. What colours are available? Available in four finishes: White Gloss, Light Grey, Mid Grey, and Matt Black. Select your preferred finish from the variant selector above. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    £825.00 £559.00

  • Sale -32% Sydney 600mm Waterproof Vanity Unit with Edge Basin - 2 Drawers White Gloss Sydney 600mm Waterproof Vanity Unit with Edge Basin - 2 Drawers

    Sydney 600mm Waterproof Vanity Unit with Edge Basin | 2 Drawers | 5 Colours

    The Sydney 600mm vanity unit is built for bathrooms that need storage as well as style. Two generous drawers keep toiletries, cosmetics, and bathroom essentials neatly organised and close to hand — while the 100% waterproof expanded PVC core ensures the unit itself will never warp, swell, or deteriorate. The luxury polyurethane (PU) surface finish delivers a premium, tactile quality that’s easy to clean and built to last. Integrated Edge basin included — available in five contemporary finishes: White Gloss, Light Grey, Mid Grey, Marble Grey, and Oak. ⚠️ Tap not included — sold separately. The basin has 1 tap hole, compatible with a standard monobloc basin mixer or pillar tap. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof expanded PVC core — won’t warp, swell, or deteriorate in high-moisture environments Luxury polyurethane (PU) surface finish — premium tactile quality, easy to clean, moisture-resistant Edge basin style — contemporary integrated basin with clean, angular lines 2 drawers — generous, organised storage for toiletries and bathroom essentials 600mm width — ideal for standard bathrooms and en-suites Integrated basin included — 1 tap hole; ready to install 5 contemporary finishes — White Gloss, Light Grey, Mid Grey, Marble Grey, Oak Freestanding installation — no specialist wall fixings required KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture Why Choose Waterproof PVC Construction? Unlike traditional MDF or wood-based bathroom furniture, the Sydney range is built on an expanded PVC core, making it completely waterproof. This material won’t warp, swell, or deteriorate when exposed to moisture — making it the ideal choice for: High-moisture bathrooms and wet rooms Family bathrooms with heavy daily use En-suites with walk-in showers Bathrooms prone to condensation Anywhere long-term durability in a wet environment is a priority Technical Specification Full dimensions including height and depth are shown in the product images above. Brand: Aqua Elegance Range: Sydney Basin Style: Edge Manufacturer: KDK (Canadian brand, manufactured in China) Configuration: Freestanding vanity unit — 2 drawers Width: 600mm Basin: Integrated Edge basin — 1 tap hole (included) Core material: Expanded PVC (100% waterproof) Surface finish: Luxury polyurethane (PU) Country of Origin: China HS Code: 9403.89 Finish options: White Gloss / Light Grey / Mid Grey / Marble Grey / Oak SKU (White Gloss): PD600-KB-WG-EDGE SKU (Light Grey): PD600-KB-LG-EDGE SKU (Mid Grey): PD600-KB-MG-EDGE SKU (Marble Grey): PD600-KB-MARBLE-EDGE SKU (Oak): PD600-KB-OAK-EDGE What’s Included Waterproof vanity unit with 2 drawers Integrated Edge basin with 1 tap hole Complete the Sydney Collection Pair this vanity unit with matching Sydney furniture for a fully coordinated bathroom: Sydney Range — view all products in the collection Melbourne & Sydney 500mm Waterproof WC Unit with Top — matching WC unit Basin Taps — select a compatible monobloc mixer or pillar tap Mirrors — coordinate with a wall mirror or LED mirror cabinet Accessories — towel rails, robe hooks, and more 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the Sydney range is built on an expanded PVC core, which is inherently waterproof. Unlike MDF or chipboard furniture that can swell and deteriorate when exposed to moisture, the PVC core will not warp, swell, or degrade even in high-humidity bathrooms or wet rooms. What is the polyurethane (PU) finish? The luxury PU finish is a high-quality surface coating applied over the waterproof PVC core. It provides a premium, tactile feel, is easy to clean, and offers excellent resistance to moisture and everyday wear. What are the dimensions? The unit is 600mm wide. Full dimensions including height and depth are shown in the product images above. Is the basin included? Yes — the integrated Edge basin with 1 tap hole is included. A tap is not included and must be purchased separately. What tap do I need? The basin has a single tap hole, compatible with any standard monobloc basin mixer tap. Browse our basin taps range to find a compatible option. What colours are available? Available in five finishes: White Gloss, Light Grey, Mid Grey, Marble Grey, and Oak. Select your preferred finish from the variant selector above. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    £805.00 £549.00

  • Sale -32% Melbourne & Sydney 500mm Waterproof WC Unit with Top | Bathroom Furniture White Gloss Melbourne & Sydney 500mm Waterproof WC Unit with Top | Bathroom Furniture

    Melbourne & Sydney 500mm Waterproof WC Unit with Top | 6 Colours

    The Melbourne & Sydney 500mm WC unit does what traditional MDF furniture simply can’t — it shrugs off water. Constructed entirely from expanded polyvinyl chloride (PVC), it is genuinely 100% waterproof. No swelling from a slow cistern leak. No warping from years of condensation. The integrated top adds practical surface space above the concealed cistern, creating a clean, streamlined look. At 500mm wide it’s compact enough for smaller bathrooms and en-suites, and designed to coordinate with both the Melbourne and Sydney vanity ranges. Available in six finishes: White Gloss, Light Grey, Mid Grey, Marble Grey, Matt Black, and Oak. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof expanded PVC core — won’t warp, swell, or deteriorate in high-moisture environments Luxury polyurethane (PU) surface finish — premium tactile quality, easy to clean, moisture-resistant Integrated top included — practical surface space above the concealed cistern 500mm width — compact footprint for smaller bathrooms and en-suites Concealed cistern design — clean, streamlined aesthetics; cistern sold separately 6 contemporary finishes — White Gloss, Light Grey, Mid Grey, Marble Grey, Matt Black, Oak Compatible with Melbourne & Sydney vanity ranges — create a fully coordinated bathroom Freestanding installation — no specialist wall fixings required KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture Why Choose Waterproof PVC Construction? Traditional MDF or wood-based WC units can suffer serious damage from toilet leaks, condensation, or cleaning spills. The Melbourne & Sydney WC unit’s expanded PVC construction provides complete protection against water damage, making it ideal for: Family bathrooms with heavy daily use High-moisture environments and wet rooms Bathrooms prone to condensation Anywhere a slow leak could otherwise cause costly damage Long-term durability without the maintenance of wood-based furniture Technical Specification Full dimensions including height and depth are shown in the product images above. Brand: Aqua Elegance Range: Melbourne & Sydney Manufacturer: KDK (Canadian brand, manufactured in China) Type: WC unit with top Width: 500mm Mounting: Freestanding Core material: Expanded PVC (100% waterproof) Surface finish: Luxury polyurethane (PU) Country of Origin: China HS Code: 9403.89 Finish options: White Gloss / Light Grey / Mid Grey / Marble Grey / Matt Black / Oak SKU (White Gloss): PF550-KB-WG SKU (Light Grey): PF550-KB-LG SKU (Mid Grey): PF550-KB-MG SKU (Marble Grey): PF550-KB-MARBLE SKU (Matt Black): PF550-KB-BLACK SKU (Oak): PF550-KB-OAK What’s Included Waterproof WC unit with top Not included — sold separately: concealed cistern, back-to-wall WC pan, flush plate. Complete Your Bathroom Pair this WC unit with matching Melbourne or Sydney furniture for a fully coordinated bathroom: Melbourne Range — view all Melbourne products Sydney Range — view all Sydney products Melbourne 500mm Waterproof Vanity Unit with Edge Basin — matching Melbourne vanity Melbourne 600mm Waterproof Vanity Unit with Edge Basin — 600mm Melbourne vanity Melbourne 750mm Waterproof Vanity Unit with Edge Basin — 750mm Melbourne vanity Melbourne 900mm Waterproof Vanity Unit with Slim Basin — 900mm Melbourne vanity Flush Plates for Frames — compatible flush plates Concealed Cisterns — compatible concealed cistern frames Back to Wall Pans — compatible WC pans 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the Melbourne & Sydney WC unit is constructed from expanded PVC (polyvinyl chloride), which is inherently waterproof. Unlike MDF or chipboard furniture that can swell and deteriorate when exposed to moisture, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms or from toilet leaks. Is the top included? Yes — the top is included with the unit. Is the cistern included? No — the concealed cistern, WC pan, and flush plate are all sold separately. This listing is for the WC unit and top only. What cistern and pan do I need? You will need a compatible concealed cistern frame, a back-to-wall WC pan, and a flush plate. Browse our concealed cisterns, back-to-wall pans, and flush plates to find compatible options, or contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk for advice. What are the dimensions? The unit is 500mm wide. Full dimensions including height and depth are shown in the product images above. What colours are available? Available in six finishes: White Gloss, Light Grey, Mid Grey, Marble Grey, Matt Black, and Oak. Select your preferred finish from the variant selector above. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    £385.00 £260.00

  • Sale -53% Portland Curve 550mm Waterproof WC Unit | Modern Bathroom Furniture Gloss White Portland Curve 550mm Waterproof WC Unit | Modern Bathroom Furniture Dark Grey

    Portland Curve 550mm Waterproof WC Unit | 3 Colours

    The Portland Curve WC unit does what traditional MDF furniture simply can’t — it shrugs off water. Constructed entirely from expanded polyvinyl chloride (PVC), it is genuinely 100% waterproof. No swelling from a slow cistern leak. No warping from years of condensation. The softly curved door profile adds a designer touch that straight-edged units can’t match, and the concealed cistern design keeps plumbing hidden for a clean, streamlined look. At 550mm wide it suits standard bathrooms and en-suites, and pairs perfectly with the Portland Curve vanity range. Available in three finishes: Gloss White, Light Grey, and Dark Grey. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof expanded PVC core — won’t warp, swell, or deteriorate in high-moisture environments Luxury polyurethane (PU) surface finish — premium tactile quality, easy to clean, moisture-resistant Modern curved door design — softens bathroom aesthetics with a contemporary, designer look 550mm width — ideal for standard bathrooms and en-suites Concealed cistern design — clean, streamlined aesthetics; cistern sold separately 3 contemporary finishes — Gloss White, Light Grey, Dark Grey Freestanding installation — no specialist wall fixings required KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture Why Choose Waterproof PVC Construction? Traditional MDF or wood-based WC units can suffer serious damage from toilet leaks, condensation, or cleaning spills. The Portland Curve WC unit’s expanded PVC construction provides complete protection against water damage, making it ideal for: Family bathrooms with heavy daily use High-moisture environments and wet rooms Bathrooms prone to condensation Anywhere a slow leak could otherwise cause costly damage Long-term durability without the maintenance of wood-based furniture Technical Specification Brand: Aqua Elegance Range: Portland Curved Manufacturer: KDK (Canadian brand, manufactured in China) Type: WC unit only Width: 550mm Depth: 300mm Height: 860mm Mounting: Freestanding Core material: Expanded PVC (100% waterproof) Surface finish: Luxury polyurethane (PU) Country of Origin: China HS Code: 9403.89 Finish options: Gloss White / Light Grey / Dark Grey SKU (Gloss White): ⚠️ Not assigned — please add SKU (Light Grey): ⚠️ Not assigned — please add SKU (Dark Grey): ⚠️ Not assigned — please add What’s Included Waterproof curved WC unit Not included — sold separately: concealed cistern, back-to-wall WC pan, flush plate. Complete the Portland Curved Collection Pair this WC unit with matching Portland Curved furniture for a fully coordinated bathroom: Portland Curved Range — view all products in the collection Portland Curve 600mm Waterproof Vanity Unit — matching curved vanity with basin Portland Curve 500mm Waterproof Vanity Unit — compact curved vanity option Flush Plates for Frames — compatible flush plates Concealed Cisterns — compatible concealed cistern frames Back to Wall Pans — compatible WC pans 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the Portland Curve WC unit is constructed from expanded PVC (polyvinyl chloride), which is inherently waterproof. Unlike MDF or chipboard furniture that can swell and deteriorate when exposed to moisture, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms or from toilet leaks. What are the dimensions? The unit is 550mm wide, 300mm deep, and 860mm tall. Is the cistern included? No — the concealed cistern, WC pan, and flush plate are all sold separately. This listing is for the WC unit carcass only. What cistern and pan do I need? You will need a compatible concealed cistern frame, a back-to-wall WC pan, and a flush plate. Browse our concealed cisterns, back-to-wall pans, and flush plates to find compatible options, or contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk for advice. What colours are available? Available in three finishes: Gloss White, Light Grey, and Dark Grey. Select your preferred finish from the variant selector above. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    £655.00 £309.00

  • Sale -31% Portland Curve 500mm Waterproof Vanity Unit with Basin | Cloakroom Furniture Gloss White Portland Curve 500mm Waterproof Vanity Unit with Basin | Cloakroom Furniture

    Portland Curve 500mm Waterproof Vanity Unit with Basin | 3 Colours

    The Portland Curve 500mm vanity unit brings something most waterproof cloakroom furniture doesn’t: genuine style. The softly curved door profile adds a designer touch that straight-edged units simply can’t match, while the 100% waterproof expanded PVC core ensures it will never warp, swell, or deteriorate. The luxury polyurethane (PU) surface finish gives it a premium, tactile quality that looks and feels a cut above standard painted furniture. At 500mm wide with an integrated basin included, it’s a complete, space-saving solution for cloakrooms and compact bathrooms — available in three contemporary finishes: Gloss White, Light Grey, and Mid Grey. ⚠️ Tap not included — sold separately. The basin has 1 tap hole, compatible with a standard monobloc basin mixer or pillar tap. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof expanded PVC core — won’t warp, swell, or deteriorate in high-moisture environments Luxury polyurethane (PU) surface finish — premium tactile quality, easy to clean, moisture-resistant Modern curved door design — softens bathroom aesthetics with a contemporary, designer look 500mm width — compact footprint, ideal for cloakrooms, en-suites, and smaller bathrooms Integrated basin included — 1 tap hole; ready to install 3 contemporary finishes — Gloss White, Light Grey, Mid Grey Freestanding installation — no specialist wall fixings required KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture Why Choose Waterproof PVC Construction? Unlike traditional MDF or wood-based bathroom furniture, the Portland Curve is built on an expanded PVC core, making it completely waterproof. This material won’t warp, swell, or deteriorate when exposed to moisture — making it the ideal choice for: Cloakrooms and downstairs WCs High-moisture bathrooms and wet rooms Family bathrooms with heavy daily use En-suites with walk-in showers Anywhere long-term durability in a wet environment is a priority Technical Specification Full dimensions including height and depth are shown in the product images above. Brand: Aqua Elegance Range: Portland Curved Manufacturer: KDK (Canadian brand, manufactured in China) Configuration: Freestanding vanity unit Width: 500mm Basin: Integrated — 1 tap hole (included) Core material: Expanded PVC (100% waterproof) Surface finish: Luxury polyurethane (PU) Country of Origin: China HS Code: 9403.89 Finish options: Gloss White / Light Grey / Mid Grey SKU (Gloss White): PFD500-KB-WG SKU (Light Grey): PFD500-KB-LG SKU (Mid Grey): PFD500-KB-MG What’s Included Waterproof curved vanity unit Integrated basin with 1 tap hole Complete the Portland Curved Collection Pair this vanity unit with matching Portland Curved furniture for a fully coordinated bathroom: Portland Curved Range — view all products in the collection Portland Curve 600mm Waterproof Vanity Unit — larger 600mm curved version Portland Curve 550mm Waterproof WC Unit — matching curved WC unit Portland 490mm Waterproof WC Unit with Worktop — WC unit with worktop option Portland 500mm Waterproof Vanity Unit with Edge Basin — straight-edge 500mm alternative Basin Taps — select a compatible monobloc mixer or pillar tap Mirrors — coordinate with a wall mirror or LED mirror cabinet 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the Portland Curve is built on an expanded PVC core, which is inherently waterproof. Unlike MDF or chipboard furniture that can swell and deteriorate when exposed to moisture, the PVC core will not warp, swell, or degrade even in high-humidity bathrooms or wet rooms. What is the polyurethane (PU) finish? The luxury PU finish is a high-quality surface coating applied over the waterproof PVC core. It provides a premium, tactile feel, is easy to clean, and offers excellent resistance to moisture and everyday wear — giving the unit a more refined appearance than standard painted finishes. What are the dimensions? The unit is 500mm wide. Full dimensions including height and depth are shown in the product images above. Is the basin included? Yes — the integrated basin with 1 tap hole is included. A tap is not included and must be purchased separately. What tap do I need? The basin has a single tap hole, compatible with any standard monobloc basin mixer tap. Browse our basin taps range to find a compatible option. What colours are available? Available in three finishes: Gloss White, Light Grey, and Mid Grey. Select your preferred finish from the variant selector above. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    £655.00 £449.00

  • Sale -31% Portland 500mm Waterproof Vanity Unit with Edge Basin | Cloakroom Furniture White Gloss Black vanity unit with sink on a white background

    Portland 500mm Waterproof Vanity Unit with Edge Basin | 6 Colours

    The Portland 500mm vanity unit features the Edge basin style — built for cloakrooms and compact bathrooms that refuse to compromise on quality. The 100% waterproof expanded PVC core means it will never warp, swell, or deteriorate, while the luxury polyurethane (PU) surface finish delivers a premium, tactile quality that’s easy to clean and built to last. At 500mm wide with an integrated basin included, it’s a complete, space-saving solution — available in six contemporary finishes: White Gloss, Light Grey, Mid Grey, Matt Blue, Matt Black, and Matt Pink. ⚠️ Tap not included — sold separately. The basin has 1 tap hole, compatible with a standard monobloc basin mixer or pillar tap. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof expanded PVC core — won’t warp, swell, or deteriorate in high-moisture environments Luxury polyurethane (PU) surface finish — premium tactile quality, easy to clean, moisture-resistant Edge basin style — contemporary integrated basin with clean, angular lines 500mm width — compact footprint, ideal for cloakrooms, en-suites, and smaller bathrooms Integrated basin included — 1 tap hole; ready to install 6 contemporary finishes — White Gloss, Light Grey, Mid Grey, Matt Blue, Matt Black, Matt Pink Freestanding installation — no specialist wall fixings required Durable and easy to clean — PVC core and PU finish resist staining and moisture damage KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture Why Choose Waterproof PVC Construction? Unlike traditional MDF or wood-based bathroom furniture, the Portland range is built on an expanded PVC core, making it completely waterproof. This material won’t warp, swell, or deteriorate when exposed to moisture — making it the ideal choice for: Cloakrooms and compact en-suites High-moisture bathrooms and wet rooms Family bathrooms with heavy daily use Bathrooms prone to condensation Anywhere long-term durability in a wet environment is a priority Technical Specification Full dimensions including height and depth are shown in the product images above. Brand: Aqua Elegance Range: Portland Basin Style: Edge Manufacturer: KDK (Canadian brand, manufactured in China) Configuration: Freestanding vanity unit Width: 500mm Basin: Integrated Edge basin — 1 tap hole (included) Core material: Expanded PVC (100% waterproof) Surface finish: Luxury polyurethane (PU) Country of Origin: China HS Code: 9403.89 Finish options: White Gloss / Light Grey / Mid Grey / Matt Blue / Matt Black / Matt Pink SKU (White Gloss): PF500-KBL-WG-EDGE SKU (Light Grey): PF500-KBL-LG-EDGE SKU (Mid Grey): PF500-KBL-MG-EDGE SKU (Matt Blue): PF500-KBL-MB-EDGE SKU (Matt Black): PF500-KBL-BLACK-EDGE SKU (Matt Pink): PF500-KBL-MP-EDGE What’s Included Waterproof vanity unit Integrated Edge basin with 1 tap hole Complete the Portland Collection Pair this vanity unit with matching Portland furniture for a fully coordinated bathroom: Portland Range — view all products in the collection Portland 600mm Waterproof Vanity Unit with Edge Basin — larger 600mm version Portland 490mm Waterproof WC Unit with Worktop — matching WC unit Portland Curve 600mm Waterproof Vanity Unit — curved door 600mm option Portland Curve 500mm Waterproof Vanity Unit — curved door 500mm option Portland Curve 550mm Waterproof WC Unit — curved WC unit Basin Taps — select a compatible monobloc mixer or pillar tap Mirrors — coordinate with a wall mirror or LED mirror cabinet 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the Portland range is built on an expanded PVC core, which is inherently waterproof. Unlike MDF or chipboard furniture that can swell and deteriorate when exposed to moisture, the PVC core will not warp, swell, or degrade even in high-humidity bathrooms or wet rooms. What is the polyurethane (PU) finish? The luxury PU finish is a high-quality surface coating applied over the waterproof PVC core. It provides a premium, tactile feel, is easy to clean, and offers excellent resistance to moisture and everyday wear. What are the dimensions? The unit is 500mm wide. Full dimensions including height and depth are shown in the product images above. Is the basin included? Yes — the integrated Edge basin with 1 tap hole is included. A tap is not included and must be purchased separately. What tap do I need? The basin has a single tap hole, compatible with any standard monobloc basin mixer tap or single pillar tap. Browse our basin taps range to find a compatible option. What colours are available? Available in six finishes: White Gloss, Light Grey, Mid Grey, Matt Blue, Matt Black, and Matt Pink. Select your preferred finish from the variant selector above. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    £625.00 £429.00

  • Sale -32% Portland 490mm Waterproof WC Unit with Worktop | Compact Bathroom Furniture White Gloss Portland 490mm Waterproof WC Unit with Worktop | Compact Bathroom Furniture Matt Blue

    Portland 490mm Waterproof WC Unit with Worktop | 10 Colours

    The Portland 490mm WC unit does what traditional MDF furniture simply can’t — it shrugs off water. Constructed entirely from expanded polyvinyl chloride (PVC), it is genuinely 100% waterproof. No swelling from a slow cistern leak. No warping from years of condensation. The integrated worktop adds practical surface space above the concealed cistern, creating a clean, streamlined look. At 490mm wide it’s compact enough for cloakrooms and smaller bathrooms, and with ten finishes available — including Matt Blue, Matt Pink, Marble Grey, and Dark Blue — there’s a colour to suit every scheme. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof expanded PVC core — won’t warp, swell, or deteriorate in high-moisture environments Luxury polyurethane (PU) surface finish — premium tactile quality, easy to clean, moisture-resistant Integrated worktop — practical surface space above the concealed cistern 490mm width — compact footprint for cloakrooms, en-suites, and smaller bathrooms Concealed cistern design — clean, streamlined aesthetics; cistern sold separately 10 contemporary finishes — White Gloss, Light Grey, Mid Grey, Matt Grey, Matt Blue, Matt Pink, Creamy White, Matt White, Dark Blue, Marble Grey Freestanding installation — no specialist wall fixings required KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture ⚠️ Note: Product images for Matt Grey, Creamy White, Matt White, Dark Blue, and Marble Grey finishes are coming soon. Please contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk if you’d like to see a sample before ordering. Why Choose Waterproof PVC Construction? Traditional MDF or wood-based WC units can suffer serious damage from toilet leaks, condensation, or cleaning spills. The Portland WC unit’s expanded PVC construction provides complete protection against water damage, making it ideal for: Family bathrooms with heavy daily use High-moisture environments and wet rooms Bathrooms prone to condensation Anywhere a slow leak could otherwise cause costly damage Long-term durability without the maintenance of wood-based furniture Technical Specification Full dimensions including height and depth are shown in the product images above. Brand: Aqua Elegance Range: Portland Manufacturer: KDK (Canadian brand, manufactured in China) Type: WC unit with worktop Width: 490mm Mounting: Freestanding Core material: Expanded PVC (100% waterproof) Surface finish: Luxury polyurethane (PU) Country of Origin: China HS Code: 9403.89 Finish options: White Gloss / Light Grey / Mid Grey / Matt Grey / Matt Blue / Matt Pink / Creamy White / Matt White / Dark Blue / Marble Grey SKU (White Gloss): WC490L-WG SKU (Light Grey): WC490L-LG SKU (Mid Grey): WC490L-MG SKU (Matt Grey): WC490L-MATT-GREY SKU (Matt Blue): WC490L-MB SKU (Matt Pink): WC490L-MP SKU (Creamy White): WC490L-CW SKU (Matt White): WC490L-MW SKU (Dark Blue): WC490L-DB SKU (Marble Grey): WC490L-MARBLE What’s Included Waterproof WC unit with worktop Not included — sold separately: concealed cistern, back-to-wall WC pan, flush plate. Complete the Portland Collection Pair this WC unit with matching Portland furniture for a fully coordinated bathroom: Portland Range — view all products in the collection Portland 600mm Waterproof Vanity Unit with Edge Basin — matching Edge vanity with basin Portland Curve 600mm Waterproof Vanity Unit — curved door vanity option Flush Plates for Frames — compatible flush plates Concealed Cisterns — compatible concealed cistern frames Back to Wall Pans — compatible WC pans 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the Portland WC unit is constructed from expanded PVC (polyvinyl chloride), which is inherently waterproof. Unlike MDF or chipboard furniture that can swell and deteriorate when exposed to moisture, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms or from toilet leaks. Is the worktop included? Yes — the worktop is included with the unit. Is the cistern included? No — the concealed cistern, WC pan, and flush plate are all sold separately. This listing is for the WC unit and worktop only. What cistern and pan do I need? You will need a compatible concealed cistern frame, a back-to-wall WC pan, and a flush plate. Browse our concealed cisterns, back-to-wall pans, and flush plates to find compatible options, or contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk for advice. What are the dimensions? The unit is 490mm wide. Full dimensions including height and depth are shown in the product images above. What colours are available? Available in ten finishes: White Gloss, Light Grey, Mid Grey, Matt Grey, Matt Blue, Matt Pink, Creamy White, Matt White, Dark Blue, and Marble Grey. Select your preferred finish from the variant selector above. Note: images for some newer finishes are coming soon. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    £335.00 £229.00

  • Sale -31% Portland 600mm Waterproof Vanity Unit with Edge Basin | Modern Design Light Grey Portland 600mm Waterproof Vanity Unit with Edge Basin | Modern Design Matt Blue

    Portland 600mm Waterproof Vanity Unit with Edge Basin | 6 Colours

    The Portland 600mm vanity unit features the Edge basin style — built for bathrooms that want clean lines and lasting resilience. The 100% waterproof expanded PVC core means it will never warp, swell, or deteriorate, while the luxury polyurethane (PU) surface finish delivers a premium, tactile quality that’s easy to clean and built to last. At 600mm wide with an integrated basin included, it’s a complete, ready-to-install solution — and with six contemporary finishes including Matt Blue and Matt Pink, there’s a colour for every bathroom scheme. ⚠️ Tap not included — sold separately. The basin has 1 tap hole, compatible with a standard monobloc basin mixer or pillar tap. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof expanded PVC core — won’t warp, swell, or deteriorate in high-moisture environments Luxury polyurethane (PU) surface finish — premium tactile quality, easy to clean, moisture-resistant Edge basin style — contemporary integrated basin with clean, angular lines 600mm width — ideal for standard bathrooms and en-suites Integrated basin included — 1 tap hole; ready to install 6 contemporary finishes — White Gloss, Light Grey, Mid Grey, Matt Blue, Matt Pink, Matt Black Freestanding installation — no specialist wall fixings required KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture Why Choose Waterproof PVC Construction? Unlike traditional MDF or wood-based bathroom furniture, the Portland range is built on an expanded PVC core, making it completely waterproof. This material won’t warp, swell, or deteriorate when exposed to moisture — making it the ideal choice for: High-moisture bathrooms and wet rooms Family bathrooms with heavy daily use En-suites with walk-in showers Bathrooms prone to condensation Anywhere long-term durability in a wet environment is a priority Technical Specification Full dimensions including height and depth are shown in the product images above. Brand: Aqua Elegance Range: Portland Basin Style: Edge Manufacturer: KDK (Canadian brand, manufactured in China) Configuration: Freestanding vanity unit Width: 600mm Basin: Integrated Edge basin — 1 tap hole (included) Core material: Expanded PVC (100% waterproof) Surface finish: Luxury polyurethane (PU) Country of Origin: China HS Code: 9403.89 Finish options: White Gloss / Light Grey / Mid Grey / Matt Blue / Matt Pink / Matt Black SKU (White Gloss): PF600-KBL-WG-EDGE SKU (Light Grey): PF600-KBL-LG-EDGE SKU (Mid Grey): PF600-KBL-MG-EDGE SKU (Matt Blue): PF600-KBL-MB-EDGE ⚠️ see note SKU (Matt Pink): PF600-KBL-MP-EDGE SKU (Matt Black): PF600-KBL-MB-EDGE ⚠️ see note ⚠️ Matt Blue and Matt Black currently share the same SKU (PF600-KBL-MB-EDGE). Please assign a unique SKU to one of these variants to avoid fulfilment errors. What’s Included Waterproof vanity unit Integrated Edge basin with 1 tap hole Complete the Portland Collection Pair this vanity unit with matching Portland furniture for a fully coordinated bathroom: Portland Range — view all products in the collection Portland 490mm Waterproof WC Unit with Worktop — matching WC unit Portland Curve 600mm Waterproof Vanity Unit — curved door version Basin Taps — select a compatible monobloc mixer or pillar tap Mirrors — coordinate with a wall mirror or LED mirror cabinet 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the Portland range is built on an expanded PVC core, which is inherently waterproof. Unlike MDF or chipboard furniture that can swell and deteriorate when exposed to moisture, the PVC core will not warp, swell, or degrade even in high-humidity bathrooms or wet rooms. What is the polyurethane (PU) finish? The luxury PU finish is a high-quality surface coating applied over the waterproof PVC core. It provides a premium, tactile feel, is easy to clean, and offers excellent resistance to moisture and everyday wear. What are the dimensions? The unit is 600mm wide. Full dimensions including height and depth are shown in the product images above. Is the basin included? Yes — the integrated Edge basin with 1 tap hole is included. A tap is not included and must be purchased separately. What tap do I need? The basin has a single tap hole, compatible with any standard monobloc basin mixer tap. Browse our basin taps range to find a compatible option. What colours are available? Available in six finishes: White Gloss, Light Grey, Mid Grey, Matt Blue, Matt Pink, and Matt Black. Select your preferred finish from the variant selector above. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    £655.00 £449.00

  • Sale -31% Melbourne 300mm Waterproof Storage Unit - 1 Door | Compact Bathroom Storage White Gloss Tall wooden cabinet with a single door in a natural finish.

    Melbourne 300mm Waterproof Storage Unit | 1 Door | 5 Colours

    Sometimes the space you have is just 300mm. The Melbourne 300mm Storage Unit is designed for exactly that — a single-door, ultra-compact storage solution that fits into narrow alcoves, tight cloakrooms, and small en-suites where a larger unit simply won’t go. Constructed from 100% waterproof expanded PVC with a luxury polyurethane (PU) surface finish, it will never warp, swell, or deteriorate. Available in five finishes to coordinate with the full Melbourne range: White Gloss, Light Grey, Mid Grey, Matt Black, and Oak. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof expanded PVC core — won’t warp, swell, or deteriorate in high-moisture environments Luxury polyurethane (PU) surface finish — premium tactile quality, easy to clean, moisture-resistant 1-door configuration — concealed storage for toiletries and bathroom essentials 300mm width — ultra-compact; fits narrow spaces, alcoves, and tight cloakrooms 5 contemporary finishes — White Gloss, Light Grey, Mid Grey, Matt Black, Oak Coordinates with Melbourne vanity units — create a fully matched bathroom scheme Freestanding installation — no specialist wall fixings required KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture Why Choose Waterproof PVC Construction? Unlike traditional MDF or wood-based bathroom storage, the Melbourne range is built on an expanded PVC core, making it completely waterproof. This material won’t warp, swell, or deteriorate when exposed to moisture — making it the ideal choice for: High-moisture bathrooms and wet rooms Compact cloakrooms and en-suites Family bathrooms with heavy daily use Bathrooms prone to condensation Anywhere long-term durability in a wet environment is a priority Technical Specification Full dimensions including height and depth are shown in the product images above. Brand: Aqua Elegance Range: Melbourne Manufacturer: KDK (Canadian brand, manufactured in China) Type: Freestanding storage unit (no basin) Width: 300mm Doors: 1 Core material: Expanded PVC (100% waterproof) Surface finish: Luxury polyurethane (PU) Country of Origin: China HS Code: 9403.89 Finish options: White Gloss / Light Grey / Mid Grey / Matt Black / Oak SKU (White Gloss): PS300-KB-WG SKU (Light Grey): PS300-KB-LG SKU (Mid Grey): PS300-KB-MG SKU (Matt Black): PS300-KB-MB SKU (Oak): PS300-KB-OAK What’s Included Waterproof storage unit with 1 door Note: No basin included. This is a storage unit only. Complete the Melbourne Collection Pair this storage unit with matching Melbourne furniture for a fully coordinated bathroom: Melbourne Range — view all products in the collection Melbourne 500mm Storage Unit — larger 2-door storage option Melbourne 500mm Waterproof Vanity Unit with Edge Basin — matching vanity with basin Melbourne 600mm Waterproof Vanity Unit with Edge Basin — 600mm vanity with basin Melbourne 750mm Waterproof Vanity Unit with Edge Basin — 750mm vanity with basin Melbourne & Sydney 500mm Waterproof WC Unit with Top — matching WC unit 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the Melbourne storage unit is built on an expanded PVC core, which is inherently waterproof. Unlike MDF or chipboard furniture that can swell and deteriorate when exposed to moisture, the PVC core will not warp, swell, or degrade even in high-humidity bathrooms or wet rooms. Does this unit include a basin? No — this is a storage unit only. No basin is included. For a matching vanity unit with integrated basin, see the Melbourne 500mm Vanity Unit with Edge Basin. What are the dimensions? The unit is 300mm wide. Full dimensions including height and depth are shown in the product images above. What colours are available? Available in five finishes: White Gloss, Light Grey, Mid Grey, Matt Black, and Oak. Select your preferred finish from the variant selector above. Does it coordinate with the Melbourne vanity units? Yes — the Melbourne storage unit is designed to coordinate with the full Melbourne vanity range. The same finishes are available across the range for a fully matched bathroom scheme. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    £305.00 £209.00

  • Sale -32% Melbourne 500mm Waterproof Storage Unit - 2 Doors | Bathroom Furniture White Gloss Black rectangular object on a white background

    Melbourne 500mm Waterproof Storage Unit | 2 Doors | 5 Colours

    The Melbourne 500mm Storage Unit is the perfect companion to the Melbourne vanity range — and a genuinely useful piece of bathroom furniture in its own right. Constructed from 100% waterproof expanded PVC with a luxury polyurethane (PU) surface finish, it will never warp, swell, or deteriorate in a wet bathroom environment. Two doors provide practical, concealed storage for toiletries, towels, and bathroom essentials, all in a compact 500mm footprint. Available in five finishes to coordinate with the full Melbourne range: White Gloss, Light Grey, Mid Grey, Matt Black, and Oak. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof expanded PVC core — won’t warp, swell, or deteriorate in high-moisture environments Luxury polyurethane (PU) surface finish — premium tactile quality, easy to clean, moisture-resistant 2-door configuration — concealed storage for toiletries, towels, and bathroom essentials 500mm width — compact footprint, ideal for smaller bathrooms and en-suites 5 contemporary finishes — White Gloss, Light Grey, Mid Grey, Matt Black, Oak Coordinates with Melbourne vanity units — create a fully matched bathroom scheme Freestanding installation — no specialist wall fixings required KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture Why Choose Waterproof PVC Construction? Unlike traditional MDF or wood-based bathroom storage, the Melbourne range is built on an expanded PVC core, making it completely waterproof. This material won’t warp, swell, or deteriorate when exposed to moisture — making it the ideal choice for: High-moisture bathrooms and wet rooms Family bathrooms with heavy daily use En-suites with walk-in showers Bathrooms prone to condensation Anywhere long-term durability in a wet environment is a priority Technical Specification Full dimensions including height and depth are shown in the product images above. Brand: Aqua Elegance Range: Melbourne Manufacturer: KDK (Canadian brand, manufactured in China) Type: Freestanding storage unit (no basin) Width: 500mm Doors: 2 Core material: Expanded PVC (100% waterproof) Surface finish: Luxury polyurethane (PU) Country of Origin: China HS Code: 9403.89 Finish options: White Gloss / Light Grey / Mid Grey / Matt Black / Oak SKU (White Gloss): PS500-GW SKU (Light Grey): PS500-LG SKU (Mid Grey): PS500-MG SKU (Matt Black): PS500-KB-MB SKU (Oak): PS500-KB-OAK What’s Included Waterproof storage unit with 2 doors Note: No basin included. This is a storage unit only. Complete the Melbourne Collection Pair this storage unit with matching Melbourne furniture for a fully coordinated bathroom: Melbourne Range — view all products in the collection Melbourne 500mm Waterproof Vanity Unit with Edge Basin — matching 500mm vanity with basin Melbourne 600mm Waterproof Vanity Unit with Edge Basin — 600mm vanity with basin Melbourne 750mm Waterproof Vanity Unit with Edge Basin — 750mm vanity with basin Melbourne 900mm Waterproof Vanity Unit with Slim Basin — 900mm vanity with basin Melbourne & Sydney 500mm Waterproof WC Unit with Top — matching WC unit 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the Melbourne storage unit is built on an expanded PVC core, which is inherently waterproof. Unlike MDF or chipboard furniture that can swell and deteriorate when exposed to moisture, the PVC core will not warp, swell, or degrade even in high-humidity bathrooms or wet rooms. Does this unit include a basin? No — this is a storage unit only. No basin is included. For a matching vanity unit with integrated basin, see the Melbourne 500mm Vanity Unit with Edge Basin. What are the dimensions? The unit is 500mm wide. Full dimensions including height and depth are shown in the product images above. What colours are available? Available in five finishes: White Gloss, Light Grey, Mid Grey, Matt Black, and Oak. Select your preferred finish from the variant selector above. Does it coordinate with the Melbourne vanity units? Yes — the Melbourne storage unit is designed to coordinate with the full Melbourne vanity range. The same finishes are available across the range for a fully matched bathroom scheme. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    £455.00 £308.00

  • Sale -32% Melbourne 1200mm Waterproof Double Vanity Unit with Twin Basins | His & Hers White Gloss Melbourne 1200mm Waterproof Double Vanity Unit with Twin Basins | His & Hers

    Melbourne 1200mm Waterproof Double Vanity Unit with Twin Slim Basins | His & Hers | 3 Colours

    The Melbourne 1200mm Double Vanity is the ultimate morning routine upgrade. Two integrated Slim basins, 1200mm of waterproof storage, and a luxury polyurethane finish — all built on a 100% waterproof expanded PVC core that will never warp, swell, or deteriorate. No more queuing for the sink. No more compromising on counter space. Whether it’s a master en-suite for two or a family bathroom that needs to work harder, this his-and-hers unit delivers the kind of functionality and finish you’d expect from a hotel, in your own home. Available in three contemporary finishes: White Gloss, Light Grey, and Mid Grey. ⚠️ Taps not included — sold separately. Each basin has 1 tap hole. Two taps are required — compatible with standard monobloc basin mixers or pillar taps. 🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering. Key Features 100% waterproof expanded PVC core — won’t warp, swell, or deteriorate in high-moisture environments Luxury polyurethane (PU) surface finish — premium tactile quality, easy to clean, moisture-resistant Twin Slim basins — his & hers configuration; 1 tap hole per basin (2 taps required, sold separately) 1200mm width — exceptional counter space and storage for couples and family bathrooms 3 contemporary finishes — White Gloss, Light Grey, Mid Grey Freestanding installation — no specialist wall fixings required Durable and easy to clean — PVC core and PU finish resist staining and moisture damage KDK (Canadian brand, manufactured in China) — premium quality waterproof bathroom furniture Why Choose Waterproof PVC Construction? Unlike traditional MDF or wood-based bathroom furniture, the Melbourne range is built on an expanded PVC core, making it completely waterproof. This material won’t warp, swell, or deteriorate when exposed to moisture — making it the ideal choice for: Luxury master en-suites with heavy daily use Family bathrooms shared by multiple people High-moisture environments and wet rooms Bathrooms prone to condensation Anywhere long-term durability in a wet environment is a priority Technical Specification Full dimensions including height and depth are shown in the product images above. Brand: Aqua Elegance Range: Melbourne Basin Style: Slim Manufacturer: KDK (Canadian brand, manufactured in China) Configuration: Freestanding double vanity unit (his & hers) Width: 1200mm Basins: Twin integrated Slim basins — 1 tap hole per basin (2 taps required, sold separately) Core material: Expanded PVC (100% waterproof) Surface finish: Luxury polyurethane (PU) Country of Origin: China HS Code: 9403.89 Finish options: White Gloss / Light Grey / Mid Grey SKU (White Gloss): PF1220-KB-WG-SLIM SKU (Light Grey): PF1220-KB-LG-SLIM SKU (Mid Grey): PF1220-KB-MG-SLIM What’s Included Waterproof double vanity unit Two integrated Slim basins (1 tap hole each) Not included: taps (2 required, sold separately). Complete the Melbourne Collection Pair this double vanity with matching Melbourne furniture for a fully coordinated bathroom: Melbourne Range — view all products in the collection Melbourne & Sydney 500mm Waterproof WC Unit with Top — matching WC unit Melbourne 1200mm Waterproof Vanity Unit with Slim Basin — single basin 1200mm version Melbourne 900mm Waterproof Vanity Unit with Slim Basin — 900mm version Basin Taps — select compatible monobloc mixers or pillar taps (2 required) Mirrors — coordinate with a wall mirror or LED mirror cabinet 100% Waterproof Furniture — browse our full waterproof range Frequently Asked Questions Is this unit genuinely waterproof? Yes — the Melbourne range is built on an expanded PVC core, which is inherently waterproof. Unlike MDF or chipboard furniture that can swell and deteriorate when exposed to moisture, the PVC core will not warp, swell, or degrade even in high-humidity bathrooms or wet rooms. How many taps do I need? Two taps are required — one per basin. Each basin has a single tap hole, compatible with any standard monobloc basin mixer tap. Browse our basin taps range to find compatible options. What is the polyurethane (PU) finish? The luxury PU finish is a high-quality surface coating applied over the waterproof PVC core. It provides a premium, tactile feel, is easy to clean, and offers excellent resistance to moisture and everyday wear. What are the dimensions? The unit is 1200mm wide. Full dimensions including height and depth are shown in the product images above. Are both basins included? Yes — both integrated Slim basins are included with the unit. Taps are not included and must be purchased separately (2 required). What colours are available? The Melbourne 1200mm Double Vanity is available in three finishes: White Gloss, Light Grey, and Mid Grey. Select your preferred finish from the variant selector above. Do you deliver outside the UK? No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering. Can I order if the item shows as out of stock? Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    £1,355.00 £915.00


You have seen 24 out of 34 products

Our 100% waterproof bathroom furniture range is constructed from PVC rather than MDF or wood — making it genuinely impervious to moisture, steam, and humidity. Unlike traditional bathroom furniture that can swell, warp, or delaminate over time, waterproof PVC furniture maintains its appearance and structural integrity for years, even in the most demanding wet environments.

Why Choose Waterproof PVC Furniture?

  • Genuinely 100% waterproof — PVC core won’t swell, warp, or delaminate
  • Ideal for wet rooms & high-humidity bathrooms — no moisture damage over time
  • Easy to clean — wipe down with a damp cloth; no special treatments needed
  • Durable & long-lasting — retains its finish far longer than MDF alternatives
  • Contemporary styling — clean lines and modern finishes

What’s in the Range?

  • Vanity units with basins
  • Wall-hung and floor-standing options
  • Storage cabinets and tall units
  • Mirror cabinets

Need help choosing? Call us on 01603 381095.

© 2026 Bubblegum Bathrooms, Powered by Shopify

    • American Express
    • Apple Pay
    • Diners Club
    • Discover
    • Google Pay
    • Klarna
    • Maestro
    • Mastercard
    • PayPal
    • Shop Pay
    • Union Pay
    • Visa

    Login

    Forgot your password?

    Don't have an account yet?
    Create account