FlowLine 500mm Waterproof Base Unit | 2-Door Storage or Sink Base

Description

The FlowLine 500mm Base Unit is the workhorse of the FlowLine fitted furniture range. At 500mm wide and 780mm tall, the twin-door design provides generous concealed storage — and it's equally at home as a sink base when paired with a compatible worktop and basin. The 100% waterproof PVC construction means it will never warp, swell, or deteriorate, no matter how wet your bathroom gets. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak.

⚠️ Delivery Notice: UK mainland delivery only. We do not ship internationally or to Northern Ireland. Scottish Highlands may incur additional costs. Please call us on 01603 381095 or email customerservice@bubblegumbathrooms.co.uk to confirm delivery eligibility before ordering.

Key Features

  • 100% waterproof PVC construction — won't warp, swell, or deteriorate in high-moisture environments
  • 2 doors — generous concealed storage for bathroom essentials
  • Versatile use — works as a storage cupboard or sink base (worktop and basin sold separately)
  • 500mm width — ideal for standard bathroom layouts
  • Floor-standing design — creates a true fitted furniture look
  • 3 contemporary finishes — Creamy White, Light Grey, Oak
  • Coordinates with the full FlowLine range — mix and match units for a bespoke fitted bathroom
  • Superior durability vs MDF or timber — immune to moisture damage

Why Choose 100% Waterproof PVC?

Traditional fitted bathroom furniture made from MDF or timber is highly susceptible to moisture damage — swelling, warping, and deteriorating over time in the humid bathroom environment. The FlowLine range is constructed entirely from waterproof PVC, making it completely immune to water damage and the ideal long-term investment for:

  • Family bathrooms with heavy daily use
  • En-suites with showers or steam
  • Bathrooms prone to condensation
  • Anyone wanting fitted furniture that genuinely lasts
  • Low-maintenance, easy-clean bathroom storage

Technical Specification

  • Brand: Aqua Elegance
  • Range: FlowLine
  • Type: Base unit — 2 doors, floor-standing (storage or sink base)
  • Width: 500mm
  • Height: 780mm
  • Depth: 330mm
  • Core material: 100% waterproof PVC
  • Country of Origin: China
  • HS Code: 9403.89
  • Finish options: Creamy White / Light Grey / Oak
  • SKU (Creamy White): FF500-KB-CW
  • SKU (Light Grey): FF500-KB-LG
  • SKU (Oak): FF500-KB-OAK

What's Included

  • FlowLine 500mm waterproof base unit carcass (in chosen finish)

Not included — sold separately: worktop, basin, and other FlowLine units. See Poly Marble Worktop — Gloss White 2000mm for a compatible worktop option.

Complete the FlowLine Collection

The FlowLine 500mm Base Unit is designed to coordinate seamlessly with other units in the FlowLine range:

Complete Your Bath with Matching Waterproof Bath Panels

The FlowLine furniture finishes colour-match our waterproof PVC bath panels — ideal for creating seamless infills between units and your bath:

Frequently Asked Questions

Is this unit genuinely waterproof?

Yes — the FlowLine range is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or timber furniture that can swell and deteriorate when exposed to water, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms.

Can I use this as a sink base?

Yes — the 500mm base unit can be used as a sink base when paired with a compatible worktop and basin, both available separately. See the Poly Marble Worktop for a compatible option.

What are the dimensions?

The unit is 500mm wide, 330mm deep, and 780mm tall.

Do you do matching plinth or scribing panels?

No — but you can use the matching waterproof bath panels to create infills, shelves, or boxing. They're available in the same finishes and cut easily to size. See the bath panel links above.

What finishes are available?

Available in three finishes: Creamy White, Light Grey, and Oak. Select your preferred finish from the variant selector above.

Can I order if the item shows as out of stock?

Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

Do you deliver outside the UK?

No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland. Scottish Highlands may incur additional costs. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

FlowLine 500mm Waterproof Base Unit | 2-Door Storage or Sink Base

Product form

🚚 Free UK Delivery is included on this item.

The FlowLine 500mm Base Unit is the workhorse of the FlowLine fitted furniture range. At 500mm wide and 780mm tall,... Read more

Free pickup in our shop(s)

£445.00  £320.00

Free Delivery
    • Guaranteed secure & safe checkout.

      paypal
    • We aim to dispatch stocked items same day 1-2 day delivery
    • Non stocked items are ordered direct 2-7 day delivery
    • Several items? ask for a bespoke price!
    • Wetwall Free Delivery On Orders Over £250
    • FREE Collection from Norwich
    • No hassle returns, 30 days return

    Description

    The FlowLine 500mm Base Unit is the workhorse of the FlowLine fitted furniture range. At 500mm wide and 780mm tall, the twin-door design provides generous concealed storage — and it's equally at home as a sink base when paired with a compatible worktop and basin. The 100% waterproof PVC construction means it will never warp, swell, or deteriorate, no matter how wet your bathroom gets. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak.

    ⚠️ Delivery Notice: UK mainland delivery only. We do not ship internationally or to Northern Ireland. Scottish Highlands may incur additional costs. Please call us on 01603 381095 or email customerservice@bubblegumbathrooms.co.uk to confirm delivery eligibility before ordering.

    Key Features

    • 100% waterproof PVC construction — won't warp, swell, or deteriorate in high-moisture environments
    • 2 doors — generous concealed storage for bathroom essentials
    • Versatile use — works as a storage cupboard or sink base (worktop and basin sold separately)
    • 500mm width — ideal for standard bathroom layouts
    • Floor-standing design — creates a true fitted furniture look
    • 3 contemporary finishes — Creamy White, Light Grey, Oak
    • Coordinates with the full FlowLine range — mix and match units for a bespoke fitted bathroom
    • Superior durability vs MDF or timber — immune to moisture damage

    Why Choose 100% Waterproof PVC?

    Traditional fitted bathroom furniture made from MDF or timber is highly susceptible to moisture damage — swelling, warping, and deteriorating over time in the humid bathroom environment. The FlowLine range is constructed entirely from waterproof PVC, making it completely immune to water damage and the ideal long-term investment for:

    • Family bathrooms with heavy daily use
    • En-suites with showers or steam
    • Bathrooms prone to condensation
    • Anyone wanting fitted furniture that genuinely lasts
    • Low-maintenance, easy-clean bathroom storage

    Technical Specification

    • Brand: Aqua Elegance
    • Range: FlowLine
    • Type: Base unit — 2 doors, floor-standing (storage or sink base)
    • Width: 500mm
    • Height: 780mm
    • Depth: 330mm
    • Core material: 100% waterproof PVC
    • Country of Origin: China
    • HS Code: 9403.89
    • Finish options: Creamy White / Light Grey / Oak
    • SKU (Creamy White): FF500-KB-CW
    • SKU (Light Grey): FF500-KB-LG
    • SKU (Oak): FF500-KB-OAK

    What's Included

    • FlowLine 500mm waterproof base unit carcass (in chosen finish)

    Not included — sold separately: worktop, basin, and other FlowLine units. See Poly Marble Worktop — Gloss White 2000mm for a compatible worktop option.

    Complete the FlowLine Collection

    The FlowLine 500mm Base Unit is designed to coordinate seamlessly with other units in the FlowLine range:

    Complete Your Bath with Matching Waterproof Bath Panels

    The FlowLine furniture finishes colour-match our waterproof PVC bath panels — ideal for creating seamless infills between units and your bath:

    Frequently Asked Questions

    Is this unit genuinely waterproof?

    Yes — the FlowLine range is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or timber furniture that can swell and deteriorate when exposed to water, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms.

    Can I use this as a sink base?

    Yes — the 500mm base unit can be used as a sink base when paired with a compatible worktop and basin, both available separately. See the Poly Marble Worktop for a compatible option.

    What are the dimensions?

    The unit is 500mm wide, 330mm deep, and 780mm tall.

    Do you do matching plinth or scribing panels?

    No — but you can use the matching waterproof bath panels to create infills, shelves, or boxing. They're available in the same finishes and cut easily to size. See the bath panel links above.

    What finishes are available?

    Available in three finishes: Creamy White, Light Grey, and Oak. Select your preferred finish from the variant selector above.

    Can I order if the item shows as out of stock?

    Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    Do you deliver outside the UK?

    No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland. Scottish Highlands may incur additional costs. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    Top 10 best selling products

    You may also like these products. These products are rated as 'top 10 best of the best' by our clients

    Returns & Delivery

    When will my order be delivered?

    Your order will be packaged really carefully and delivered wherever you want. Delivery takes between 2-4 business days. Look out for emails from our delivery partners, You will receive an e-mail after ordering with more information about the delivery.

    Can I return my product?

    Orders can be returned or exchanged within 30 days of receiving the parcel, providing they are in original resalable condition.

    What can I do if my item (or part of it) is damaged?

    We work hard to deliver your items without damage. If anything arrives damaged on delivery just refuse the delivery, Any damages found after delivery must be reported with photographic evidence. Orders can be returned or exchanged within 30 days of receiving the delivery, providing they are in original resalable condition.

    Recently viewed products

      © 2026 Bubblegum Bathrooms, Powered by Shopify

        • American Express
        • Apple Pay
        • Diners Club
        • Discover
        • Google Pay
        • Klarna
        • Maestro
        • Mastercard
        • PayPal
        • Shop Pay
        • Union Pay
        • Visa

        Login

        Forgot your password?

        Don't have an account yet?
        Create account