FlowLine 500mm Waterproof WC Unit | Fitted Bathroom Furniture | 3 Colours

Description

The FlowLine 500mm WC Unit is the waterproof answer to the age-old problem of toilet leaks destroying bathroom furniture. Constructed from 100% waterproof PVC, it will never warp, swell, or deteriorate — even if the cistern drips for years. Designed to house a concealed cistern system, it creates a clean, streamlined look that coordinates seamlessly with the rest of the FlowLine fitted furniture range. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak.

🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering.

Key Features

  • 100% waterproof PVC construction — won’t warp, swell, or deteriorate in high-moisture environments
  • Concealed cistern design — clean, streamlined aesthetics; cistern sold separately
  • 500mm width — standard fit for most bathroom layouts
  • Floor-standing design — creates a true fitted furniture look
  • 3 contemporary finishes — Creamy White, Light Grey, Oak
  • Coordinates with the full FlowLine range — pair with base units, tall units, and vanity units
  • Superior durability vs MDF or timber — immune to moisture and leak damage

Why Choose 100% Waterproof PVC?

WC units are particularly vulnerable to water damage from slow cistern leaks, condensation, and cleaning. Traditional MDF or timber WC furniture can swell, warp, and deteriorate over time. The FlowLine range’s waterproof PVC construction eliminates this risk entirely, making it ideal for:

  • Family bathrooms with heavy daily use
  • Preventing costly water damage from toilet leaks
  • Bathrooms prone to condensation
  • Anyone wanting fitted furniture that genuinely lasts
  • Low-maintenance, easy-clean bathroom furniture

Technical Specification

  • Brand: Aqua Elegance
  • Range: FlowLine
  • Type: WC unit — floor-standing, concealed cistern
  • Width: 500mm
  • Height: 780mm
  • Depth: 330mm
  • Core material: 100% waterproof PVC
  • Country of Origin: China
  • HS Code: 9403.89
  • Finish options: Creamy White / Light Grey / Oak
  • SKU (Creamy White): FFWC500-KB-CW
  • SKU (Light Grey): FFWC500-KB-LG
  • SKU (Oak): FFWC500-KB-OAK

What’s Included

  • FlowLine waterproof WC unit

Not included — sold separately: concealed cistern, back-to-wall WC pan, flush plate.

Complete the FlowLine Range

The FlowLine WC Unit is designed to coordinate seamlessly with other units in the FlowLine range:

Frequently Asked Questions

Is this unit genuinely waterproof?

Yes — the FlowLine range is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or timber furniture that can swell and deteriorate when exposed to water or leaks, the PVC construction will not warp, swell, or degrade.

What are the dimensions?

The unit is 500mm wide, 330mm deep, and 780mm tall.

Is the cistern included?

No — the concealed cistern, WC pan, and flush plate are all sold separately. This listing is for the WC unit carcass only. Browse our concealed cisterns, back-to-wall pans, and flush plates for compatible options.

What finishes are available?

Available in three finishes: Creamy White, Light Grey, and Oak. Select your preferred finish from the variant selector above.

Can I order if the item shows as out of stock?

Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

Do you deliver outside the UK?

No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

FlowLine 500mm Waterproof WC Unit | Fitted Bathroom Furniture | 3 Colours

Product form
Free Shipping

The FlowLine 500mm WC Unit is the waterproof answer to the age-old problem of toilet leaks destroying bathroom furniture. Constructed... Read more

Free pickup in our shop(s)

£385.00  £260.00

    • Guaranteed secure & safe checkout.

      paypal
    • Standard Delivery £5.99
    • Wetwall Direct Delivery £48
    • Wetwall Free Delivery On Orders Over £250
    • FREE Collection from Norwich
    • No hassle returns, 30 days return

    Description

    The FlowLine 500mm WC Unit is the waterproof answer to the age-old problem of toilet leaks destroying bathroom furniture. Constructed from 100% waterproof PVC, it will never warp, swell, or deteriorate — even if the cistern drips for years. Designed to house a concealed cistern system, it creates a clean, streamlined look that coordinates seamlessly with the rest of the FlowLine fitted furniture range. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak.

    🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering.

    Key Features

    • 100% waterproof PVC construction — won’t warp, swell, or deteriorate in high-moisture environments
    • Concealed cistern design — clean, streamlined aesthetics; cistern sold separately
    • 500mm width — standard fit for most bathroom layouts
    • Floor-standing design — creates a true fitted furniture look
    • 3 contemporary finishes — Creamy White, Light Grey, Oak
    • Coordinates with the full FlowLine range — pair with base units, tall units, and vanity units
    • Superior durability vs MDF or timber — immune to moisture and leak damage

    Why Choose 100% Waterproof PVC?

    WC units are particularly vulnerable to water damage from slow cistern leaks, condensation, and cleaning. Traditional MDF or timber WC furniture can swell, warp, and deteriorate over time. The FlowLine range’s waterproof PVC construction eliminates this risk entirely, making it ideal for:

    • Family bathrooms with heavy daily use
    • Preventing costly water damage from toilet leaks
    • Bathrooms prone to condensation
    • Anyone wanting fitted furniture that genuinely lasts
    • Low-maintenance, easy-clean bathroom furniture

    Technical Specification

    • Brand: Aqua Elegance
    • Range: FlowLine
    • Type: WC unit — floor-standing, concealed cistern
    • Width: 500mm
    • Height: 780mm
    • Depth: 330mm
    • Core material: 100% waterproof PVC
    • Country of Origin: China
    • HS Code: 9403.89
    • Finish options: Creamy White / Light Grey / Oak
    • SKU (Creamy White): FFWC500-KB-CW
    • SKU (Light Grey): FFWC500-KB-LG
    • SKU (Oak): FFWC500-KB-OAK

    What’s Included

    • FlowLine waterproof WC unit

    Not included — sold separately: concealed cistern, back-to-wall WC pan, flush plate.

    Complete the FlowLine Range

    The FlowLine WC Unit is designed to coordinate seamlessly with other units in the FlowLine range:

    Frequently Asked Questions

    Is this unit genuinely waterproof?

    Yes — the FlowLine range is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or timber furniture that can swell and deteriorate when exposed to water or leaks, the PVC construction will not warp, swell, or degrade.

    What are the dimensions?

    The unit is 500mm wide, 330mm deep, and 780mm tall.

    Is the cistern included?

    No — the concealed cistern, WC pan, and flush plate are all sold separately. This listing is for the WC unit carcass only. Browse our concealed cisterns, back-to-wall pans, and flush plates for compatible options.

    What finishes are available?

    Available in three finishes: Creamy White, Light Grey, and Oak. Select your preferred finish from the variant selector above.

    Can I order if the item shows as out of stock?

    Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    Do you deliver outside the UK?

    No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    Top 10 best selling products

    You may also like these products. These products are rated as 'top 10 best of the best' by our clients

    Returns & Delivery

    When will my order be delivered?

    Your order will be packaged really carefully and delivered wherever you want. Delivery takes between 2-4 business days. Look out for emails from our delivery partners, You will receive an e-mail after ordering with more information about the delivery.

    Can I return my product?

    Orders can be returned or exchanged within 30 days of receiving the parcel, providing they are in original resalable condition.

    What can I do if my item (or part of it) is damaged?

    We work hard to deliver your items without damage. If anything arrives damaged on delivery just refuse the delivery, Any damages found after delivery must be reported with photographic evidence. Orders can be returned or exchanged within 30 days of receiving the delivery, providing they are in original resalable condition.

    Recently viewed products

      © 2026 Bubblegum Bathrooms, Powered by Shopify

        • American Express
        • Apple Pay
        • Diners Club
        • Discover
        • Google Pay
        • Klarna
        • Maestro
        • Mastercard
        • PayPal
        • Shop Pay
        • Union Pay
        • Visa

        Login

        Forgot your password?

        Don't have an account yet?
        Create account