Local to Norwich - Visit Us

FlowLine Combination B | Fitted Bathroom Furniture Set | 3 Colours

Description

FlowLine Combination B is the wider-format version of our complete fitted bathroom set. Four coordinating units — a tall storage unit, a 300mm base unit, a 600mm base unit (ideal as a larger sink base), and a 500mm WC unit — all supplied in your chosen finish, all constructed from 100% waterproof PVC that will never warp, swell, or deteriorate. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak.

💰 Save £580 compared to buying units individually.
🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering.

What’s Included in Combination B

  • FlowLine 300mm Tall Unit — 1900×300×330mm, floor-standing, maximises vertical storage
  • FlowLine 300mm Base Unit — 780×300×330mm, single door, compact storage
  • FlowLine 600mm Base Unit — 780×600×330mm, 2 doors, storage cupboard or sink base
  • FlowLine 500mm WC Unit — 780×500×330mm, designed for concealed cistern system

Total combined width (all units): 1700mm

How Does Combination B Differ from Combination A?

Combination B replaces the 500mm base unit with a wider 600mm base unit, giving you more counter space and storage when used as a sink base. Total combined width increases from 1600mm to 1700mm. All other units are identical.

Key Features

  • 100% waterproof PVC construction throughout — won’t warp, swell, or deteriorate in high-moisture environments
  • Four coordinating units — complete fitted bathroom look in one purchase
  • 600mm base unit — wider sink base option vs Combination A
  • All units supplied in your chosen finish — perfectly matched
  • 3 contemporary finishes — Creamy White, Light Grey, Oak
  • Floor-standing design — true fitted bathroom aesthetic
  • Save £580 vs buying units individually
  • Superior durability vs MDF or timber — immune to moisture damage

Why Choose 100% Waterproof PVC?

Traditional fitted bathroom furniture made from MDF or timber is highly susceptible to moisture damage — swelling, warping, and deteriorating over time. The FlowLine range is constructed entirely from waterproof PVC, making it completely immune to water damage and the ideal long-term investment for:

  • Family bathrooms with heavy daily use
  • En-suites with showers or steam
  • Bathrooms prone to condensation
  • Anyone wanting fitted furniture that genuinely lasts

Technical Specification

  • Brand: Aqua Elegance
  • Range: FlowLine
  • Set: Combination B (4 units)
  • Core material: 100% waterproof PVC
  • Country of Origin: China
  • HS Code: 9403.89
  • Finish options: Creamy White / Light Grey / Oak
  • SKU (Creamy White): FF-COMBI-B-CW
  • SKU (Light Grey): FF-COMBI-B-LG
  • SKU (Oak): FF-COMBI-B-OAK

Unit Dimensions

  • Tall Unit: 1900mm (H) × 300mm (W) × 330mm (D)
  • 300mm Base Unit: 780mm (H) × 300mm (W) × 330mm (D)
  • 600mm Base Unit: 780mm (H) × 600mm (W) × 330mm (D)
  • 500mm WC Unit: 780mm (H) × 500mm (W) × 330mm (D)
  • Total combined width: 1700mm

Not Included — Sold Separately

To complete your bathroom installation you will also need:

Explore the FlowLine Range

Frequently Asked Questions

What units are included in Combination B?

Combination B includes four units: the FlowLine 300mm Tall Unit, FlowLine 300mm Base Unit, FlowLine 600mm Base Unit, and FlowLine 500mm WC Unit — all in your chosen finish.

What’s the difference between Combination A and Combination B?

Combination B replaces the 500mm base unit (in Combination A) with a wider 600mm base unit, giving more counter space and storage. Total combined width is 1700mm vs 1600mm for Combination A.

How much do I save vs buying individually?

Combination B saves you £580 compared to purchasing the four units separately.

Is the cistern, basin, or worktop included?

No — the basin, worktop, concealed cistern, WC pan, flush plate, and taps are all sold separately. See the links above for compatible options.

What finishes are available?

Available in three finishes: Creamy White, Light Grey, and Oak. All four units will be supplied in your chosen finish.

Can I order if the item shows as out of stock?

Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

Do you deliver outside the UK?

No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

FlowLine Combination B | Fitted Bathroom Furniture Set | 3 Colours

Product form
Free Shipping

FlowLine Combination B is the wider-format version of our complete fitted bathroom set. Four coordinating units — a tall storage... Read more

Free pickup in our shop(s)

£1,785.00  £1,205.00

    • Guaranteed secure & safe checkout.

      paypal
    • Standard Delivery £5.99
    • Wetwall Direct Delivery £48
    • Wetwall Free Delivery On Orders Over £250
    • FREE Collection from Norwich
    • No hassle returns, 30 days return

    Description

    FlowLine Combination B is the wider-format version of our complete fitted bathroom set. Four coordinating units — a tall storage unit, a 300mm base unit, a 600mm base unit (ideal as a larger sink base), and a 500mm WC unit — all supplied in your chosen finish, all constructed from 100% waterproof PVC that will never warp, swell, or deteriorate. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak.

    💰 Save £580 compared to buying units individually.
    🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering.

    What’s Included in Combination B

    • FlowLine 300mm Tall Unit — 1900×300×330mm, floor-standing, maximises vertical storage
    • FlowLine 300mm Base Unit — 780×300×330mm, single door, compact storage
    • FlowLine 600mm Base Unit — 780×600×330mm, 2 doors, storage cupboard or sink base
    • FlowLine 500mm WC Unit — 780×500×330mm, designed for concealed cistern system

    Total combined width (all units): 1700mm

    How Does Combination B Differ from Combination A?

    Combination B replaces the 500mm base unit with a wider 600mm base unit, giving you more counter space and storage when used as a sink base. Total combined width increases from 1600mm to 1700mm. All other units are identical.

    Key Features

    • 100% waterproof PVC construction throughout — won’t warp, swell, or deteriorate in high-moisture environments
    • Four coordinating units — complete fitted bathroom look in one purchase
    • 600mm base unit — wider sink base option vs Combination A
    • All units supplied in your chosen finish — perfectly matched
    • 3 contemporary finishes — Creamy White, Light Grey, Oak
    • Floor-standing design — true fitted bathroom aesthetic
    • Save £580 vs buying units individually
    • Superior durability vs MDF or timber — immune to moisture damage

    Why Choose 100% Waterproof PVC?

    Traditional fitted bathroom furniture made from MDF or timber is highly susceptible to moisture damage — swelling, warping, and deteriorating over time. The FlowLine range is constructed entirely from waterproof PVC, making it completely immune to water damage and the ideal long-term investment for:

    • Family bathrooms with heavy daily use
    • En-suites with showers or steam
    • Bathrooms prone to condensation
    • Anyone wanting fitted furniture that genuinely lasts

    Technical Specification

    • Brand: Aqua Elegance
    • Range: FlowLine
    • Set: Combination B (4 units)
    • Core material: 100% waterproof PVC
    • Country of Origin: China
    • HS Code: 9403.89
    • Finish options: Creamy White / Light Grey / Oak
    • SKU (Creamy White): FF-COMBI-B-CW
    • SKU (Light Grey): FF-COMBI-B-LG
    • SKU (Oak): FF-COMBI-B-OAK

    Unit Dimensions

    • Tall Unit: 1900mm (H) × 300mm (W) × 330mm (D)
    • 300mm Base Unit: 780mm (H) × 300mm (W) × 330mm (D)
    • 600mm Base Unit: 780mm (H) × 600mm (W) × 330mm (D)
    • 500mm WC Unit: 780mm (H) × 500mm (W) × 330mm (D)
    • Total combined width: 1700mm

    Not Included — Sold Separately

    To complete your bathroom installation you will also need:

    Explore the FlowLine Range

    Frequently Asked Questions

    What units are included in Combination B?

    Combination B includes four units: the FlowLine 300mm Tall Unit, FlowLine 300mm Base Unit, FlowLine 600mm Base Unit, and FlowLine 500mm WC Unit — all in your chosen finish.

    What’s the difference between Combination A and Combination B?

    Combination B replaces the 500mm base unit (in Combination A) with a wider 600mm base unit, giving more counter space and storage. Total combined width is 1700mm vs 1600mm for Combination A.

    How much do I save vs buying individually?

    Combination B saves you £580 compared to purchasing the four units separately.

    Is the cistern, basin, or worktop included?

    No — the basin, worktop, concealed cistern, WC pan, flush plate, and taps are all sold separately. See the links above for compatible options.

    What finishes are available?

    Available in three finishes: Creamy White, Light Grey, and Oak. All four units will be supplied in your chosen finish.

    Can I order if the item shows as out of stock?

    Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    Do you deliver outside the UK?

    No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    Top 10 best selling products

    You may also like these products. These products are rated as 'top 10 best of the best' by our clients

    Returns & Delivery

    When will my order be delivered?

    Your order will be packaged really carefully and delivered wherever you want. Delivery takes between 2-4 business days. Look out for emails from our delivery partners, You will receive an e-mail after ordering with more information about the delivery.

    Can I return my product?

    Orders can be returned or exchanged within 30 days of receiving the parcel, providing they are in original resalable condition.

    What can I do if my item (or part of it) is damaged?

    We work hard to deliver your items without damage. If anything arrives damaged on delivery just refuse the delivery, Any damages found after delivery must be reported with photographic evidence. Orders can be returned or exchanged within 30 days of receiving the delivery, providing they are in original resalable condition.

    Recently viewed products

      © 2026 Bubblegum Bathrooms, Powered by Shopify

        • American Express
        • Apple Pay
        • Diners Club
        • Discover
        • Google Pay
        • Klarna
        • Maestro
        • Mastercard
        • PayPal
        • Shop Pay
        • Union Pay
        • Visa

        Login

        Forgot your password?

        Don't have an account yet?
        Create account