FlowLine 300mm Waterproof Tall Storage Unit | Fitted Bathroom Furniture | 3 Colours

Description

The FlowLine Tall Unit is the anchor piece of the FlowLine fitted furniture range — a floor-to-ceiling storage solution that brings a bespoke, built-in look to any bathroom without the vulnerability of traditional timber furniture. At 1900mm tall and just 300mm wide, it delivers impressive storage in a slim footprint, and the 100% waterproof PVC construction means it will never warp, swell, or deteriorate. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak.

🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering.

Key Features

  • 100% waterproof PVC construction — won’t warp, swell, or deteriorate in high-moisture environments
  • 1900mm height — floor-to-ceiling storage in a slim 300mm footprint
  • Floor-standing design — creates a true fitted furniture look
  • 3 contemporary finishes — Creamy White, Light Grey, Oak
  • Coordinates with the full FlowLine range — mix and match units for a bespoke fitted bathroom
  • Superior durability vs MDF or timber — immune to moisture damage
  • Easy to clean — waterproof PVC surface resists staining and moisture

Why Choose 100% Waterproof PVC?

Traditional fitted bathroom furniture made from MDF or timber is highly susceptible to moisture damage — swelling, warping, and deteriorating over time in the humid bathroom environment. The FlowLine range is constructed entirely from waterproof PVC, making it completely immune to water damage and the ideal long-term investment for:

  • Family bathrooms with heavy daily use
  • En-suites with showers or steam
  • Bathrooms prone to condensation
  • Anyone wanting fitted furniture that genuinely lasts
  • Low-maintenance, easy-clean bathroom storage

Technical Specification

  • Brand: Aqua Elegance
  • Range: FlowLine
  • Type: Tall storage unit — floor-standing
  • Width: 300mm
  • Height: 1900mm
  • Depth: 330mm
  • Core material: 100% waterproof PVC
  • Country of Origin: China
  • HS Code: 9403.89
  • Finish options: Creamy White / Light Grey / Oak
  • SKU (Creamy White): FF300-KBL-CW
  • SKU (Light Grey): FF300-KBL-LG
  • SKU (Oak): FF300-KBL-OAK

What’s Included

  • FlowLine waterproof tall storage unit

Not included — sold separately: basin, worktop, other FlowLine units.

Complete the FlowLine Range

The FlowLine Tall Unit is designed to coordinate seamlessly with other units in the FlowLine range, allowing you to create a fully fitted, bespoke bathroom look:

Frequently Asked Questions

Is this unit genuinely waterproof?

Yes — the FlowLine range is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or timber furniture that can swell and deteriorate when exposed to water, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms.

What are the dimensions?

The unit is 300mm wide, 330mm deep, and 1900mm tall.

Is a basin or worktop included?

No — this listing is for the tall storage unit only. Basins, worktops, and other FlowLine units are available separately. Browse the FlowLine range and FlowLine Add-Ons for compatible options.

What finishes are available?

Available in three finishes: Creamy White, Light Grey, and Oak. Select your preferred finish from the variant selector above.

Can I order if the item shows as out of stock?

Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

Do you deliver outside the UK?

No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

FlowLine 300mm Waterproof Tall Storage Unit | Fitted Bathroom Furniture | 3 Colours

Product form
Free Shipping

The FlowLine Tall Unit is the anchor piece of the FlowLine fitted furniture range — a floor-to-ceiling storage solution that... Read more

Free pickup in our shop(s)

£545.00  £369.00

    • Guaranteed secure & safe checkout.

      paypal
    • Standard Delivery £5.99
    • Wetwall Direct Delivery £48
    • Wetwall Free Delivery On Orders Over £250
    • FREE Collection from Norwich
    • No hassle returns, 30 days return

    Description

    The FlowLine Tall Unit is the anchor piece of the FlowLine fitted furniture range — a floor-to-ceiling storage solution that brings a bespoke, built-in look to any bathroom without the vulnerability of traditional timber furniture. At 1900mm tall and just 300mm wide, it delivers impressive storage in a slim footprint, and the 100% waterproof PVC construction means it will never warp, swell, or deteriorate. Available in three sophisticated finishes: Creamy White, Light Grey, and Oak.

    🚨 UK mainland delivery only. This product is stocked in the UK. We ship to UK mainland addresses only — we do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please contact us on 01603 381095 to confirm delivery eligibility before ordering.

    Key Features

    • 100% waterproof PVC construction — won’t warp, swell, or deteriorate in high-moisture environments
    • 1900mm height — floor-to-ceiling storage in a slim 300mm footprint
    • Floor-standing design — creates a true fitted furniture look
    • 3 contemporary finishes — Creamy White, Light Grey, Oak
    • Coordinates with the full FlowLine range — mix and match units for a bespoke fitted bathroom
    • Superior durability vs MDF or timber — immune to moisture damage
    • Easy to clean — waterproof PVC surface resists staining and moisture

    Why Choose 100% Waterproof PVC?

    Traditional fitted bathroom furniture made from MDF or timber is highly susceptible to moisture damage — swelling, warping, and deteriorating over time in the humid bathroom environment. The FlowLine range is constructed entirely from waterproof PVC, making it completely immune to water damage and the ideal long-term investment for:

    • Family bathrooms with heavy daily use
    • En-suites with showers or steam
    • Bathrooms prone to condensation
    • Anyone wanting fitted furniture that genuinely lasts
    • Low-maintenance, easy-clean bathroom storage

    Technical Specification

    • Brand: Aqua Elegance
    • Range: FlowLine
    • Type: Tall storage unit — floor-standing
    • Width: 300mm
    • Height: 1900mm
    • Depth: 330mm
    • Core material: 100% waterproof PVC
    • Country of Origin: China
    • HS Code: 9403.89
    • Finish options: Creamy White / Light Grey / Oak
    • SKU (Creamy White): FF300-KBL-CW
    • SKU (Light Grey): FF300-KBL-LG
    • SKU (Oak): FF300-KBL-OAK

    What’s Included

    • FlowLine waterproof tall storage unit

    Not included — sold separately: basin, worktop, other FlowLine units.

    Complete the FlowLine Range

    The FlowLine Tall Unit is designed to coordinate seamlessly with other units in the FlowLine range, allowing you to create a fully fitted, bespoke bathroom look:

    Frequently Asked Questions

    Is this unit genuinely waterproof?

    Yes — the FlowLine range is constructed from 100% waterproof PVC, which is inherently resistant to moisture. Unlike MDF or timber furniture that can swell and deteriorate when exposed to water, the PVC construction will not warp, swell, or degrade even in high-humidity bathrooms.

    What are the dimensions?

    The unit is 300mm wide, 330mm deep, and 1900mm tall.

    Is a basin or worktop included?

    No — this listing is for the tall storage unit only. Basins, worktops, and other FlowLine units are available separately. Browse the FlowLine range and FlowLine Add-Ons for compatible options.

    What finishes are available?

    Available in three finishes: Creamy White, Light Grey, and Oak. Select your preferred finish from the variant selector above.

    Can I order if the item shows as out of stock?

    Yes — this product is available to order even when stock shows as zero. Please allow additional lead time and contact us on 01603 381095 or at customerservice@bubblegumbathrooms.co.uk to confirm availability.

    Do you deliver outside the UK?

    No — this product is available for UK mainland delivery only. We do not ship internationally or to Northern Ireland, Scottish Highlands (Additional Costs Apply), or offshore islands. Please call us on 01603 381095 to confirm delivery eligibility before ordering.

    Top 10 best selling products

    You may also like these products. These products are rated as 'top 10 best of the best' by our clients

    Returns & Delivery

    When will my order be delivered?

    Your order will be packaged really carefully and delivered wherever you want. Delivery takes between 2-4 business days. Look out for emails from our delivery partners, You will receive an e-mail after ordering with more information about the delivery.

    Can I return my product?

    Orders can be returned or exchanged within 30 days of receiving the parcel, providing they are in original resalable condition.

    What can I do if my item (or part of it) is damaged?

    We work hard to deliver your items without damage. If anything arrives damaged on delivery just refuse the delivery, Any damages found after delivery must be reported with photographic evidence. Orders can be returned or exchanged within 30 days of receiving the delivery, providing they are in original resalable condition.

    Recently viewed products

      © 2026 Bubblegum Bathrooms, Powered by Shopify

        • American Express
        • Apple Pay
        • Diners Club
        • Discover
        • Google Pay
        • Klarna
        • Maestro
        • Mastercard
        • PayPal
        • Shop Pay
        • Union Pay
        • Visa

        Login

        Forgot your password?

        Don't have an account yet?
        Create account